| 1 | Dismantling of RCC Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 2 | Dismantling of bricks Works stacking of dismantled material within 60M in drain bed including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 3 | Dewatering by 7.50 H.P deisel pump including fuel and pump operating staff material/HP/Hour depreceation of boring set for E.W in foundation laying R.C.C in foundation and brick work |
| 4 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. |
| 5 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 6 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 7 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 8 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. |
| 9 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 10 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 11 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 12 | Supplying and fixing marble plate 300x300 mm size on VRB including all cost of labour, material, T&P etc. required for proper completion of the work. |
| 13 | Disposal all dismantled material in Drain Bed/Chakraod Ramp with T & P etc. complete Please Enable Macros to View BoQ information |