| 1 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in hard/dense soil complete all as specified and directed. |
| 2 | All same as per item No 1 here-in-above but in soft/ loose soil -do- |
| 3 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft / loose complete all as specified and directed |
| 4 | Removing excavated surplus soil to a distance out side vicinity of MD land and depositing where directed complete all as directed. |
| 5 | Taking down old GI tubing and connection including cleaning for re fixing stacking at site where directed for the following sizes:- a) 15 mm bore of pipe. |
| 6 | b) 20 mm bore of pipe. |
| 7 | c) 25 mm bore of pipe. |
| 8 | d) 40 mm bore of pipe. |
| 9 | e) 50 mm bore of pipe. |
| 10 | Laying only GI tube medium grade with all fittings all new (ISI Marked) fixed to wall and ceiling or laid in floors making necessary connection and testing complete of the following bore of pipe:- a) 15 mm bore of pipe. |
| 11 | b) 20 mm bore of pipe. |
| 12 | c) 20 mm bore of pipe. |
| 13 | d) 40 mm bore of pipe. |
| 14 | e) 50 mm bore of pipe. (Note : for item No 10 to 14 : Servicable GI Pipes obtained from item No 5 (a) ,(b) , (c) & (d) here -in - above). |
| 15 | M & L for 15 mm bore steel water tubing medium grade (ISI marked) with fittings all new (ISI marked) fixed to wall and ceiling or laid in floors complete all as directed. |
| 16 | All as per item No 15 here -in - above but 20 mm bore of pipe. |
| 17 | All as per item No 15 here -in - above but 25 mm bore of pipe. |
| 18 | All as per item No 15 here -in - above but 40 mm bore of pipe. |
| 19 | All as per item No 15 here -in - above but 50 mm bore of pipe. |
| 20 | All as per item No 15 here -in - above but 40 mm bore light grade as cable protection laid in floor / fixed on poles with suitable size of MS clamps -do - |
| 21 | M&L in repair for double wall corrugated (DWC) duct (dure guard) as per IS 14930 part II LT UG cable protection including coupler, elbows, T joiints, Bends etc. and test report Make: Dura line/ Gemini/ Rex of size 50mm inner dia all as per direted. |
| 22 | All as per item No -21 here-in-before above but 38 mm inner dia |
| 23 | S&F in repairs Bronze gate valve (Hex type) ISI marked screwed both ends of 50 mm diameter Art No 1006 of Make: Zoloto or Equivalent in SEIKO/GEM complete all as specified and as directed . |
| 24 | All as per item No. 23 here in above but for 40 mm bore |
| 25 | All as per item No. 23 here in above but for 25 mm bore |
| 26 | All as per item No. 23 here in above but for 20 mm bore |
| 27 | All as per item No. 23 here in above but for 15 mm bore |
| 28 | Taking out damaged / rusted / wornout pipe from excavated trenches & Supply, laying, joint, testing and commissioning of DI pipes 150 mm bore Centrifugally cast, laid in excavated trenches with internal cement mortar lining, external metalic zinc coating with finishing layer of black bitumen, pressure pipe spigot & socket with bolts & nuts & gaskets of suitable size , confirming to IS 8329-2000 with ISI marked K-7 in standard length including any type of specials as required / ordered such as bends, Tapers, Tee pieces (single & double branch) any type and angle / radius and straight connecting pieces etc & necessary ethylene propylene diene monomer (EPDM) rubber gasket, tyton jointings, jointing materials complete all as specified. |
| 29 | All as per item No. 28 here in above but for 100 mm bore Please Enable Macros to View BoQ information |
| 30 | All as per item No. 28 here in above but for 100 mm bore Please Enable Macros to View BoQ information |