| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 3 | Sand filling in plinth including supply of necessary quantity of local sand from a distance not exceeding 8 Kms from the site of work and including watering dressing etc. required for proper completion of work. |
| 4 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. |
| 6 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) inPLINTH BEAM excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. |
| 7 | COLUMN Up to plinth level |
| 8 | As in item 7 above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20. |
| 9 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. |
| 10 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in slab excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. ground floor |
| 11 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone ballast in the proportion of 1:1.5:3 (M-20) in beams excluding supply of reinforcement and its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being inluded in the item. |
| 12 | First Class brick work in 1:6 cement and coarse sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. (1:6 cement & coarse sand) |
| 13 | Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand) Ground floor |
| 14 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). Including supply of all materials, water proofing compound, labour T&P etc. complete. |
| 15 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. |
| 16 | Providing & laying \\"brick Coba\\" 120mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with acrylic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30 cm x 30 cm and side wall parapet shall be mono lythic plaster wall upto 30cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonry coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including S/o all material, labour T & P etc complete for proper completion of work. |
| 17 | Providing and fixing 1mm thick M.S. sheet door with frame of 35x35x5 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using MS angle 35x35x5 mm for diagonal bracing |
| 18 | Providing and fixing MS grill of reqired pattern in frames of window etc.with MS flats square or round bars etc. i/c priming coat with approved steel primer a complete.Fixed to steel window by weldeding. |
| 19 | P/F TMT Bar -Fe 500 in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. Ground Floor |
| 20 | 15 mm cement plaster on plinth side of single or half brick wall of mix : 1:6 (1 cement : 6 coarse sand) |
| 21 | 12mm cement plaster in single coat on fair side of single or half brick wall for exterior plastering up to floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80mm in girth and finished even and smooth. 1 cement : 6 Course sand |
| 22 | Making drip coarse sand in sun shades or facia with 1:3 cement and fine sand mortar as per direction of Engineer-in charge including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 23 | 62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 24 | Supplying and fixing rolling shutters of approved make, made of required size M.S.laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover |
| 25 | Providing and fixing ball bearing for rolling shutters. |
| 26 | Painting or vanishing two coats on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials labour and T & P etc. required for proper completion of work.Paint to be used should confirm to the I.S.I No.103 1950 |
| 27 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade. New work (Two or more coats applied @ 1.25 ltr/ 10 sqm. over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm). |
| 28 | Distempering (Two coat) with oil bound distemper of approved brand and manufacture & of required shade on ceiling to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as Berger, J & N, Shalimar, Asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters including cost of all labour & materials. |
| 29 | Providing and fixing on wall face unplasticised - PVC moulded fittings /accessories for unplasticised Rigid PVC rain water pipes conformingto IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion |
| 30 | WBM Grading - II-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. |
| 31 | Construction of reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement complete including supply of all material labour T&P etc. required for proper completion of work . |
| 32 | Centering and shuttering including strutting, propping etc. and removal of form for(A)Foundations, footings, bases of columns, etc. for mass concrete. |
| 33 | Centering and shuttering including strutting, propping etc. and removal of form for(B)Suspended floors, roofs, landings, balconies and access platform. with water proof ply 12 mm thick. |
| 34 | Centering and shuttering including strutting, propping etc. and removal of form for(C)Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick |
| 35 | Centering and shuttering including strutting, propping etc. and removal of form for(D)Columns,Pillars, Piers, Abutments, Posts and Struts. Please Enable Macros to View BoQ information |