| 1 | Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete. This includes supply of labour, tools & plants including materials.Planting hedge plants in two rows at 30cm apart. |
| 2 | Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment) |
| 3 | Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%). |
| 4 | Supplying and fixing grasses tiles of grass Maxican Carpet/Selection No. 1 Healthy & fresh grasses (size 1\"x1\" or bigger) including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from wees and fit for mowing including supplying good earth as required by Engineer-in-charge. (Rate includes supply of labour, tools & plants including materials) |
| 5 | Maintenance of hedge for one year including application of necessary pesticide, farm yard manure, replacement of damaged hedge plant by new one complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools & plants including materials. |
| 6 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) |
| 7 | Planting of trees ( Avenue plants) in 0.60m dia holea, 1m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure. This includes supply of labour, tools & plants including materials but excluding cost of tree. |
| 8 | Maintanance of trees for one year (Avenue Plants) including watering, trimming, manuring, spraying insecticide and guarding as required. This includes supply of labour, tools & plants including materials. |
| 9 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 10 | Supply of unskilled labour for regular cleaning, gardening and take care of Garden of PWD Inspection Bungalow and Garden within Birbhum Division Office premises at Suri. |
| 11 | Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. ii) Rangon chineese of size not less than 20cm |
| 12 | viii) China palm of leaves 4-5 in earthen pots size 25cm |
| 13 | xxxiv) Dracaena Rosea of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 14 | ix) Ficus bengalensis (variegated) of height 60-75cm in earthen pots size 30cm |
| 15 | xi) Ficus elastica Decora ( Rubber plant ) of height 90cm- 60cm in each earthen pot of size 25cm. |
| 16 | xiv) Acalypha species ( Red/Green) of height 30cm-90cm in earthen pots of size 25cm. |
| 17 | xv) Acalypha species (Red/Green) of height 30cm-90cm in earthen pots of size 20 cm. |
| 18 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 19 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.B) WallWith Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m.(a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative |
| 20 | Add GST 18% over the Sub-Total upto item No. 19 |
| 21 | Labour Welfare CESS 1% over the Sub-Total upto item No. 20 Please Enable Macros to View BoQ information Compatibility Report for V3_BOQ_Percentage_Template.xls Run on 5/11/2015 12:49 The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format. Significant loss of functionality # of occurrences Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped. 3.0 \"BoQ1\"!A1:II34 Minor loss of fidelity Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned. 5Defined Names Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 15.0 |