| 1 | Supply of following decentralised material as per UPCL RESPO. |
| 2 | E-clamp for SP-55 |
| 3 | Holding clamp for SP-55 with nut and bolt. |
| 4 | Nut and Bolts. |
| 5 | Holding clampf or PCC pole. |
| 6 | X Arm clamp for PCC pole with nut and bolt. |
| 7 | F Clamp for PCC pole with nut and bolt. |
| 8 | LT clamp for PCC pole with nut and Bolt. |
| 9 | Earth wire clamp for SP-55 with nut and bolt. |
| 10 | Stay clamp for PCC pole. |
| 11 | Schackle Insulator. |
| 12 | HT stay Insulator |
| 13 | Bracing clamp bottom with nut and bolt for SP-55. |
| 14 | Bracing clamp top with nut and bolt for SP-55. |
| 15 | Al. Crimping type Lugs 25 Sq.mm. |
| 16 | HT tape. |
| 17 | Following labour work as per UPCL norms. |
| 18 | Making cable trench. |
| 19 | Erection of earthing rod. |
| 20 | Fabrication of steel. |
| 21 | Excavation of pit for stay set. |
| 22 | Erection of LT stay set. |
| 23 | Erection of 11 KV stay set. |
| 24 | Grouting fo stay set. |
| 25 | Excavation of pit for pole. |
| 26 | Erection of single PCC pole. |
| 27 | Erection of single SP-55 pole. |
| 28 | Erection of PCC Double pole. |
| 29 | Erection of SP-55 Double pole. |
| 30 | Grouting of Pole. |
| 31 | Muffing of Pole. |
| 32 | Dismantling of 16 KVA DTR. |
| 33 | Dismantling of 25 KVA DTR. |
| 34 | Dismantling of 63 KVA DTR. |
| 35 | Dismantling of 100 KVA DTR. |
| 36 | Dismantling of 250 KVA DTR. |
| 37 | Installation of HT PRMC |
| 38 | Installation of LT PRMC. |
| 39 | Laying of LT Service cable (Overhead). |
| 40 | laying of LT PVC Cable, upto 150 Sq.mm. |
| 41 | Layign of U/G 11 KV cable in trench. |
| 42 | Instlation of 100 KVA DTR on pole structure. |
| 43 | Instlation of 63 KVA DTR on pole structure. |
| 44 | Instlation of 25 KVA DTR on pole structure. |
| 45 | Fixing of Fuse Set. |
| 46 | Fixing of Lightning Arrestor. |
| 47 | Laying of Weasel Condcutor in HT line. |
| 48 | Laying of Rabbit conductor in HT line. |
| 49 | Laying of Dog conductor in HT line. |
| 50 | Laying of 03P 04W LT line (Weasel). |
| 51 | Laying of 02P 03W LT line (Weasel). |
| 52 | Laying of 01P 02W LT line (Weasel). |
| 53 | Guarding of LT/11 KV line. |
| 54 | T-Off Connection complete 11 KV line. |
| 55 | Fixing of 11 KV XLPE Jointing Kit. |
| 56 | Cartage of PCC Pole, 51-70 Km. |
| 57 | Cartage of SP-55 Pole, 51-70 Km. |
| 58 | Cartage of Petty material, 51-70 Km. |
| 59 | Cartage of 16/25 KVA DTR, 51-70 Km. |
| 60 | Cartage of 63 KVA DTR, 51-70 Km. |
| 61 | Cartage of 100 KVA DTR, 51-70 Km. |
| 62 | Headload cartage of PCC pole, 0-1 Km. |
| 63 | Headload cartage of SP-55 Pole, 0-1 Km. |
| 64 | Headload cartage of material 0-1 Km. |
| 65 | Headload cartage of 25 KVA DTR, 0-1 Km. |
| 66 | Headload cartage of 63 KVA DTR, 0-1 Km. |
| 67 | Headload cartage of 100 KVA DTR, 0-1 Km. |
| 68 | Back Cartge of DTR (16-160 KVA) Distance, 01-20 Km. |
| 69 | Back Cartge of DTR (250-500 KVA) Distance, 01-20 Km. |
| 70 | Looping and Chopping of tree branchases. Please Enable Macros to View BoQ information |