| 1 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of Skm also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR 2023 SL. No. 2.25(a) Page 94, V-1 |
| 2 | Earth work in excavation by mechenical means (Hydraulic excavator)/manual means in foundation treanches or drains (not exceeding 1.5 m in width 10 sqm on plan) including dressing of sides and ramining of bottoms, for all lift including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. As per S.1. No. 2.8.1 Page 91, V-1 |
| 3 | 1:5:10 (1 cement: 5 fine sand derived from natural sources: 10 graded stone aggregate 40 mm nominal size derived from natural sources) As per S.I. No. 4.1.11 Page 104, V-1 |
| 4 | Reinforced cement concrete work in beams, suspended floors, rocfs having slope up 5-to 15\" landings, balconies, shelves, chajjas, lintels, panas, plain window sills. staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded As per S.I. No. 5.3 Page 113, V-1 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars As per S.1. No. 5.22.1 Page 118, V-1 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for 3 Suspended floors, roofs, landings, balconies and access platform As per S.I. No. 5.9.3 Page 115, V-1 |
| 7 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common bunt clay non modular bricks. As per S.I. No. 11.2 Page 189, V-1 |
| 8 | S/Fixing sign board at Site |
| 9 | Less 5% Competitive price efficeincy Please Enable Macros to View BoQ information |