| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). |
| 2 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 3 | PRE MIX CARPETProviding and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications.16.38.1 On W.B.M. @ 0.75 Kg/sqm. |
| 4 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisherequipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. |
| 5 | PRE MIX CARPETProviding and applying tack coat using hot straight run bitumen of grade – VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm |
| 6 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). |
| 7 | SEAL COATProviding and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cumof fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. |
| 8 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : |
| 9 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). |
| 10 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)including 20% plum. |
| 11 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 50 mm thick with 20mm nominal size stone aggregate. |
| 12 | CEMENT PLASTER (IN FINE SAND)12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for:1 Foundations, footings, bases for columns |
| 14 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete.600 mm dia. R.C.C. pipe |
| 15 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work sand lead upto 45 kms avg |
| 16 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone agg below 40 mm avg lead upto 10 kms avg |
| 17 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone agg above 40 mm avg lead upto 10 kms avg Please Enable Macros to View BoQ information |