| 1 | Extra for providing and mixing water proofing material in cement concrete work @1 kg per 50 kg of cement . |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 3 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 4 | Providing gola 75 x 75 mm in cement concrete 1:2:4 (1 Cement : 2 coarse sand : 4 stone aggregate 10 mm and downgauge ) including finishing with cement motar 1:3 ( 1 cement : 3 fine sandas per standard design |
| 5 | In 75 x 75 mm deep chase |
| 6 | Making khurras 45x45 cm with average minimum thickness of 5 cm cementconcrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finishedwith 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coatof neat cement, rounding the edges and making and finishing the outletcomplete |
| 7 | 20 mm cement plaster of mix : |
| 8 | 1:4 (1 cement: 4 fine sand) |
| 9 | 12 mm cement plaster of mix: |
| 10 | 1:4 (1cement : 4 coarse sand ) |
| 11 | 6 mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat of neat cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams. |
| 12 | Neat cement punning. |
| 13 | Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers. |
| 14 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 15 | Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 16 | Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. |
| 17 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 18 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. |
| 19 | For thickness of tiles 10 mm to 25 mm |
| 20 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead |
| 21 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting,unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 22 | Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504- 3 having compressive strength Class R4 ≥45 MPa and adhesive bond strength Class R3 ≥1.5 MPa. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. |
| 23 | For sealing cracks and faulty construction joints, routed out/ making U-shape groove size 25x25 mm and then primed the area with integral crystalline slurry @0.05 kg/running metre and while the surface is tacky filled the groove upto surface with crystalline mortar @1.50 kg/running metre. Once crystalline mortar is touch dry then finally applied two coats of integral crystalline slurry @0.05 kg/running metre per coat |
| 24 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. |
| 25 | Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding). |
| 26 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge |
| 27 | 75 mm average thickness |
| 28 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. |
| 29 | ars upto 12 mm diameter |
| 30 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of EngineerIn-charge complete in all respect. |
| 31 | SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer |
| 32 | Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. |
| 33 | Providing and filling the cracks on the plastered surface of walls with ready to use flexible PU (Polyuratyhane ) sealant (Make:CPWD APPROVED) after making V groove of size upto 10mm width and tooling the same to the surface level smoothy with a spatula inclusive of labour and material cost |