| 1 | Description of works |
| 2 | The provision made for the best teak of cutting from the large size of the teak logs with well season knot free used for the lipping patti of the size the 50mm to 38mm & the required height of the door windowfixing with the g.i.crimped mesh jali25 x 25 x 2.54mm with using the proper screw fixing with proper mesh jali with using the jali with experienced carpenter works done as the Archaeological site, the fixing of the lipping patti in such a way that without the damage the caves opening in the day times the special care required to take during the execution for the visitors and mazdoor, the items including the wastages, scaffolding necessary fixture require to the opening which inclusion of the hinges, aldrop, tower bolts all the material into the brass using require fixing material such as the Araldite fixing placingshifting of the material from the foot of the hill to the work site etc. complete. as directed by the work incharge etc complete. |
| 3 | Providing and applying two coats of synthetic enamel paints of first quality of approved colour / shade work including scaffolding with necessary and preparing surface as directed by the work incharge etc complete. |
| 4 | Providing and applying polish to the wood work using malmet, wax, yellow soil including scaffolding knotting preparing the finish surface as directed by the work incharge etc complete. |
| 5 | The provision made for the barricading at the Vedika Pattern the wood required cutting from large size of the wooden logs the wood for well seasoned, knot free best teak wood for the barricading of stupa Vedica pattern railing of size 0.9m height and the vertical pillar at the center to center supported section 0.125 x 0.125 with top railing of size 0.125 x 0.125 and two rows section of size 0.15 x 0.10m with the pedestal base of the cross design of size 0.40 x 0.55 x 0.125m and making arrangement / provision for passing cable through the section of railing to conceal illumination cable of the caves lighting system as per including scantling of the wood in size cutting designing and also to provide the opening into the railing with hinges, making the proper joints as the site is the Archaeological and high flow of the visitors in which the experienced skill carpenter are required also the care is required for the visitors as well as workers the works the execution of the work without damage and execution of the work in low visitors hours also the shifting of the material from the foot of the hill to work site into low visitors hours. in the day time the rate inclusion of the shifting of the material, execution, placing, finishing, polishing as per the standard, the require screw, adhesives, nails necessary hinges, aldrop, required fixtures as directed by the work incharge etc complete. |
| 6 | The provision made for the barricade of the Vedika Pattern in the reinforcement concrete as per the standard design in which the one vertical pillars and three horizontal beam of the reinforcement, the required design as directed by the work incharges the rate inclusion of the from works of the customize size in which modified into the required size also the rate inclusion of the rods required to fix with admixture at the base and the finishing the surface of the barricade into the rock appearing plaster with the matching to the texture in which required to execute the work with experienced skill workers are required also care is required for visitors hours also the shifting of the material from foot of the hill to the work site into low visitors hours in the day time , the rate inclusion of the shifting of the material, execution, placing, finishing , polishing as per strand the require screw, admixture by the work incharges. |
| 7 | The Provision made for the removal of the R.C.C Slab beam uncoursed rubble massonery coursed rubble massonery wall at the right of the ChityaGriha, the require to remove manually without vibration with tools such that which not generate any vibration as it’s the Archaeological site and the disposing all the material beyond the premises of the Archaeological Survey of India, the special care is required to take for the structure, worker as well as visitors, the removal of the material of the slab in the low visiting hours and also the shifting of the material from the work site to out side area with head load the rate inclusion of the shifting of the material with head load, scaffolding, stacking the useful material etc. completeas the directed by the work incharge. |
| 8 | The provision made for the laying the slab beam and foundation of the required size into the cement concrete of the volume mix of the 1:1.5:3 with inclusion of the finishing the surface as per the admixture, as the site is the Archaeological site the work required to execute by the skill workers and special care are required to for the visitors as well as workers the hill to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time the rate inclusion of the shifting of the material required size to be require and the water required for execution and curing etc. complete as the directed by the work incharge. |
| 9 | The provision made for the various diameter of the reinforcement of TMT bars for the concrete members of beam, cloum slab and foundation and required as per the size as the rate inclusion of the shifting of the material from the foot of the hill to work site. As the rate inclusion of the cutting, bending, fixing with the required binding wires as as the directed by the work incharge. As the Archaeological site the work required to execute by the skill workers and special care are required to for the visitors as well as workers shifting of the material from the hill to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time the rate inclusion of the fabrication, cutting and bending etc. complete. as the directed by the work incharge. |
| 10 | The provision made for the formwork required to casting the from work required for the required size of the R.C.C railing beam footing, coloum and slab as per the is required with the new execution with special care is required with the new plywood, required jack of the slab required, the rate inclusion of the shifting of the material from the foot of the hill to the works site, shuttering oil, the best quality plywood’s, jacks etc.required. As the Archaeological site the work required to execute by the skill workers and special care are required to for the visitors as well as workers the hill to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time the etc. complete as the directed by the work incharge. |
| 11 | The provision made for the desilting of the Ancient Water Cistern at the caves area to as the Archaeological Site for the removal of the silt from, ancient tank removal of the silt by the experienced staff with supervision with slow process and manual removal and shifting and screening with standard sieve separate the pebbles, shifting the material by head load at the out side premises important material as per the required location without disturbing visitors movement and safety and security of the visitors as well as works. The carrying material by head load in low visiting hours and day timing hours as the directed by the work incharge. |
| 12 | The provision made for the laying placing the caste in situ of the cement concrete M-15 of trap metal for the base, coping with the volume mixing of the 1:2:4 and the control water cement ratio, the inclusion of the finishing the surface as per the requirement of the site with required admixture as the site located at the Archaeological site work execute with skill experienced workersspecial care are required to for the visitors as well as workers the hill to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time. The rate inclusion of the shifting of the material required mixture vibrate, admixture waterproofing material finishing curing and require to shift the water from the foot of the hill to work site etc. complete as the directed by the work incharge. |
| 13 | The provision made for the uncoursed rubble masonary at the top of the hill with the rubble proper faces and the through stone required also the masonary in the cement mortar 1:5 with control water cement ration the inclusion of the with weep holes and header require to provide throughout the width of the wall, the construction of the wall with proper finish. The construction of the wall with proper alignment in the layer wise, the surface with required admixture, scaffolding stacking and shifting of the material from the foot of the hill to the work site the special care required during the visitors hours of the foot of hill to the work site special care are required to for the visitors as well as workers the shifting of the material from foot of the hill to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time. The rate inclusion curing require to shift the water, rate inclusion of the scaffolding, pointing, finishing lead and lift as directed by the work incharge etc complete. |
| 14 | The provision made for the rock appearing plaster to the external surface in to the two coats to stone massonery R.C.C concrete surface with the thickness of the 12 to 15mm thickness in the cement mortar 1:2 the mixing with control volume mixing and the control water cement ratio adding with the stone dust, admixture as the site located at the Archaeological site work execute with skilled workers special care required during the visitors hours of the foot of hill to the work site special care are required to for the visitors as well as workers the hill, the rate inclusion of the shifting of the material from the foot of the hill to work site, the shifting material to the work site in low visiting hours also execution of the work in the low visiting hours also execution of the work in the day time. Also the require to add the stone dust including the scaffolding lead and lift, curing require to shift the water etc. complete as the directed by the work incharge. |
| 15 | GST 18% of SL.No.1 to 13 |