Name of Work: CONSTRUCTION OF BOUNDARY WALL AROUND CHANDMARI COPPER MINES OPEN PIT
Sl. No.
Item Description
1
Earthworkinexcavationbymechanicalmeans(Hydraulic excavator)/manualmeansinfoundationtrenchesordrains(not exceeding 1.5 m in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out theexcavatedsoilanddisposalofsurplusexcavatedsoilas directed, within a lead of 50 m All kinds of soil.
2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6(1Cement:3coarsesand:6gradedstone aggregate 20 mm nominal size).
3
Randomrubblemasonrywithhard stone in foundationand plinthincludinglevelling up withcementconcrete1:6:12(1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)
4
RANDOM RUBBLE MASONARY WITH HARD STONE IN SUPERSTRUCTURE ABOVE PLINTH LEVEL AND UPTO FLOOR TWO LEVEL, WITH CEMENT MORTAR 1:6 (1 CEMENT :6 FINE SAND). STONE ONLY, SHALL BE SUPPLIED FREE OF COST AT SITE, BY COMPANY.
5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
6
Centeringandshutteringincludingstrutting,proppingetc.and removal of form for : Foundations,footings,basesofcolumns,etc.for mass concrete.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.