| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. . |
| 2 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed with mechanical means 5km & carriage of earth etc all complete. |
| 3 | Supplying and filling in plinth with sand in under floors, including watering, ramming, consolidating and dressing complete |
| 4 | Providing and laying Plain Cement Concrete of proportion (1:4:8) in foundation using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. |
| 5 | Providing and laying R,C,C, (1:1.5:3) using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; including the cost of centering & shuttering as per direction of the engineer-in-charge; (FOUNDATION) |
| 6 | COLOUM BEAM |
| 7 | PLINTH BEAM |
| 8 | Providing and laying R,C,C, (1:1.5:3) using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; including the cost of centering & shuttering as per direction of the engineer-in-charge; (GROUND FLOOR COLUMN) |
| 9 | LINTEL |
| 10 | ROOF BEAM |
| 11 | CHAJJA |
| 12 | ROOF SLAB |
| 13 | Providing & fixing TOR Fe-500 HYSD Reinforcement bars (SAIL /TATA /RINL/JINDAL/SHYAM) of required diameter and approved quality for Reinforced Cement Concrete work including straightening, cutting, bending, binding, welding(if approved) , joining (if necessary), tying the grills, hoisting, lowering and placing in position as per the approved design & drawings (BBS) with provision of standard fan hooks including the cost of all materials, cost of all labour, conveyance, loading, unloading, cost of binding wires of 18 to 20 gauge, T&P, etc, all complete as per the direction of Engineer-in-Charge. |
| 14 | Providing and laying Brick Masonry work in Foundation & Plinth using Fly ash bricks of 25 Cm. x 12 Cm. x 7.5 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. |
| 15 | Providing and laying of Full Brick Masonry work in Superstructure using Fly ash bricks of 25 Cm. x 12 Cm. x 7.5 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. STEP |
| 16 | PARAPET |
| 17 | Providing and applying 16 mm cement plaster of mix :1:6 (1 cement: 6 Fine sand) on External surfaces of walls (brick or concrete surfaces) finished smooth with trowel including scaffolding, curing etc., complete at all heights. |
| 18 | Providing and applying 12 mm cement plaster of mix :1:6 (1 cement: 6 Fine sand) on internal surfaces of walls (brick or concrete surfaces) finished smooth with trowel including scaffolding, curing etc., complete at all heights. |
| 19 | Providing and applying 6 mm cement plaster of mix :1:4 (1 cement : 4 fine sand) on the all concrete surfaces of columns, beams and slabs finished smooth and even. |
| 20 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.fixed to openings with rawl plugs and necessary screw etc.as per direction of E-I-C.(Ref. No. : CPWD DSR 2021,Vol-1, page no-153 Item no.9.48.1) |
| 21 | Painting two coats with wheather seal coat over a coat of waterbound wall primer including all cost complete |
| 22 | Wall Painting two coats with plastic emulsion paint including all cost |
| 23 | Finishing plastered surface with wall care putty and making smooth surface to receive painting including cost of plaster of paris. |
| 24 | Supplying all materials, labour and T&P for Fixing tiles in floor, treads of steps, landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixing with pigment to match the shade of the tiles including rubbing and polishing including cost of pre-cast Vitrified tiles etc. as per specification and direction of EIC |
| 25 | Supplying all materials, labour and T&P fo Fixing tile in dadoos, skirting and riser of steps on 12 mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixing with pigment to match the shade of the tiles including rubbing and polishing including cost of pre-cast tiles. (Ceramic) etc. as per specification and direction of EIC. |
| 26 | 2.50 cm thick grading concrete using C.C. (1:2:2) on roof slab with 6mm sizes down graded H.G. chips on new work (For 1 Sqmt) |
| 27 | Fitting and fixing of Electrical items etc all complete |
| 28 | Fitting and fixing of P.H. items etc all complete |
| 29 | Providing, fitting & fixing of Lawn grass & landscaping etc including all cost complete. |
| 30 | Providing, fitting & fixing of Ornamental plants |
| 31 | Installation of RCC Benches all Etc complete |
| 32 | Cost towards Transperency board, photograph, & other unforseen items |
| 33 | Add towards GST 18% Please Enable Macros to View BoQ information |