| 1 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete |
| 3 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete |
| 4 | C.C (1:2:4) using 12mm to 20mm size hard granite chips including cost, conveyance and royalty of all materials, cost of all labour, T&P etc., complete |
| 5 | RCC M-20 cement concrete with using 12mm to 20 mm down graded chips with all cost labour material complete including cost of all machinary such as conccrete mixture,vibrator etc (COLUMN FOOTING) |
| 6 | COLUMN BEAM |
| 7 | PLINTH BEND |
| 8 | ROOF SLAB |
| 9 | DRAIN BED |
| 10 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. |
| 11 | Providing and laying Brick Masonry work in Foundation & Plinth using Fly ash bricks of 25 Cm. x 12 Cm. x 7.5 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. |
| 12 | Providing and laying of Full Brick Masonry work in Superstructure using Fly ash bricks of 25 Cm. x 12 Cm. x 7.5 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. |
| 13 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. |
| 14 | Supplying all materials, labour and T&P for 12 mm thick cement plaster (1:3) over brick work finished smooth with punning, watering and curring etc. as per specification and direction of EIC. |
| 15 | Supplying all materials, labour and T&P for Painting two coats over a coat of priming with cost of paint and primer. |
| 16 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect |
| 17 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. |
| 18 | Carrage of earth including all cost etc. complete |
| 19 | Cost towards Transperency board, photograph, & other unforseen items |
| 20 | Add towards GST 18% Please Enable Macros to View BoQ information |