|
| 1 | Finishing wall with weather proof exterior grade emulsion of approved design Apexultima protex) or its equarlied on undecorated wall surfaces (two coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth including carriage of materials in all leads as per directions of the Engineer-in-Charge. |
| 2 | Removing dry or oil bound distemper, water proofing cement paint and the like by scraping and sand papering the wall surface smooth including necessary repairs to scratches complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 3 | Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. (i) One or more coats on old work |
| 5 | Repair to plaster in patches of 2.50 square meter under and upto 10 to 15mm thick including cutting the patch in proper shape and re-plastering the surface of wall including disposal to the dumping ground with a lead of 20 metres with including carriage of mateirals in all leads and lifts as per directions of the Engineer-in-Charge. (i) Cement Mortar 1:5(One cement: Five sand). |
| 6 | Scaffolding in building side including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 7 | Providing and applying base coat for Apexultima protek including carriage of materials in all leads and lifts as per direction of Engineer - in - Charge . |
| 8 | Lettering with black / coloured japan paint of approved brand and manufacture complete in all respect . |
| 9 | Removing old paint from wooden surfaces including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 10 | Disposal of muck /denris/ excavated earth upto site approved by Municipal Corporation surrounding Shimla upto all leads and lifts as per directions of the Engineer-in-Charge. |
| 11 | Steel work welded in built up sections, and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. |
| 12 | Provdiing and fixing polycarbonated sheet 2.00mm thick in lining with galvanised self driven screws complete with all accessories as required including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 13 | Painting two coats(excluding coat) on new wood and wood based surface with enamel paint to give an even shade including cleaning the surface of dirt,dust and other foreign matter,sand papering & stoping including carriage of materials in all leads as per directions of the Engineer-in-Charge.(i) With white enemal paint. |
| 14 | Providing and fixing Copper oxidised ( iron ) (i) Butt hings 75x47x1.70 mm |
| 15 | Providing and fixing anodized M.S sliding door bolt anodized colour and shade with bolts and nuts screws etc. complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 250x16mm |
| 16 | Providing and fixing Oxidised tower bolts (berrel type) anodized trans parent or dyed to required shade and colour with screws etc. complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i)200x10mm |
| 17 | supplying and fixing welded mesh 225x25x3mm to wood or steel members in partitions etc including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. Please Enable Macros to View BoQ information |