Name of Work:- Renovation Of Talab Gp Kesooli Ps Delwara
Sl. No.
Item Description
1
Cutting & clearance of jungle, bushes, shrubs Ankra/ Ipomoea,Juliflor atypna etc.on canal and bunds in dry/ moist/slushy conditions including disposal as per instructions of theEngineer-in-charge.Cost of wood has been deducted from rates and thus will be property of contractor after cutting Thick
2
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in Soft/Loose soil
3
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in Hard soil mixed with Kankar / boulders, Morrum
4
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
5
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing,compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm
6
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)
7
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm
8
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets,aprons etc. (non suspended horizontally laid mass concrete)
9
Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de watering wherever required and all applicable taxes and levies etc. complete in all respect Earth or Soil Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.