| 1 | SCHEDULE \"A\" PART I Excavation in trenches n. exc 1.5m wide & n. exc 1.5m deep for foundation, pipeline etc n. exc. 10 Sqm on plan & n. exc. 1.5m depth and getting out in Soft/loose soil complete all as specified and directed |
| 2 | Returning filling including spreading, leveling watering & well ramming in layers n. exc. 25cm in soft/loose soil complete all as specified and directed |
| 3 | Removing excavated soil to a distance n exc 50m & depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed . |
| 4 | Demolition of brick work or stone/boulder masonary, built in cement mortar including all quoins,arches, pillars, etc.complete all as specified and directed |
| 5 | M&L for brickwork with subclass \"B\" bricks, straight or curved on plan exc 6m mean radius, built in cement mortor 1:6 etc.complete all as specified and directed |
| 6 | Taking down cement plaster plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with wateretc. complete all as specified and directed |
| 7 | M & L for rendering 10mm thick on fair faces of brick work or concrete surfaces in CM 1:4 finished even and smooth without using extra cementcomplete all as specified and directed |
| 8 | Material and labour for rendering 15mm thick in cement motar 1:4 on Brickwork with sub- class ‘B’ bricks straight or curved on plan exc 6 m mean radius complete all as specified and directed |
| 9 | Demolition of cement concrete in ground floors and paving not exceeding 15cm thickness(below or above GL)complete all as specified and directed by Engineer in charge. |
| 10 | M&L forPCC 1:4:8 type, D2 (40mm graded stone agg.) as in foundation filling and mass concrete complete all as specified and directed |
| 11 | M&L for PCC 1:3:6 type C1 using 20mm graded stone aggregate as in coping including necessary form work.complete all as specified and directed |
| 12 | Demolation of cement concrete (reinforced) of any description and in any position not otherwise specially porvided etc.complete all as specified and directed |
| 13 | S & F mild steelTMT bars 10mm dia & over as in reinforcement including cutting, cranking bending & binding with mild steel annealed wire not less than 0.9mm dia or securing with clip.complete all as specified and directed |
| 14 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints laid in trenches or floors 75mm bore pipes. complete all as specified and directed |
| 15 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints laid in trenches or floors 110mm bore pipes.complete all as specified and directed |
| 16 | M&L PVC (SWR) pipe 75mm bore, single socketed in any length with rubber ring joints fixed to walls fixed in repair complete all as specified and directed . |
| 17 | M&L PVC (SWR) pipe 110mm bore, single socketed in any length with rubber ring joints fixed to walls fixed in repair. complete all as specified and directed |
| 18 | Material and Labour for cutting into existing manholes for connecting new drains, making good to pipe and plastering the disturbed portions in CM 1:3 to match with surround surfaces, cutting out existing benching and forming branch channel (1/2 round or ¾ round section) in cement concrete 1:2:4 type B-1 finished smooth and reforming benching as required for 100/110 mm bore pipe complete all as specified and as directed |
| 19 | Material and Labour for cutting into existing manholes for connecting new drains, making good to pipe and plastering the disturbed portions in CM 1:3 to match with surround surfaces, cutting out existing benching and forming branch channel (1/2 round or ¾ round section) in cement concrete 1:2:4 type B-1 finished smooth and reforming benching as required for 150/160mm bore pipe complete all as complete all as specified and directed |
| 20 | Material and Labour for cutting into existing manholes for connecting new drains, making good to pipe and plastering the disturbed portions in CM 1:3 to match with surround surfaces, cutting out existing benching and forming branch channel (1/2 round or ¾ round section) in cement concrete 1:2:4 type B-1 finished smooth and reforming benching as required for 200/225mm bore pipe complete all as specified and directed |
| 21 | Dismantling cast iron work of any description of manhole cover or similar items etc complete all as specified and directed |
| 22 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete) set in cement mortar of 150/160mm dia complete all as specified and as directed |
| 23 | M&L for Salt-glazed stoneware drain pipes 150mm dialaid in trenches and jointed complete all as specified and directed |
| 24 | M&L for cement concrete C-2 (1:3:6) for 150mm pipe bed to drain pipes including packing under, and haunching againstthe sides of pipes after they are laid and tested; in complete all as specified and directed. |
| 25 | Demolition and breaking up of drain pipes (salt glazed ware or AC or reinforced cement concrete) set in cement mortar of 200/225mm dia complete all as specified and directed |
| 26 | M&L for Salt-glazed stoneware drain pipes 200mm dialaid in trenches and jointed complete all as specified and directed |
| 27 | M&L for cement concrete C-2 (1:3:6) for 200 mm pipe bed to drain pipes including packing under, and haunching againstthe sides of pipes after they are laid and tested; in complete all as specified and directed. |
| 28 | Attending of complaint by covering the following items of work :-(a) Cleaning and clearing of blocked IWCs and EWCs to sewage line upto 1st manholes by rodding or any other suitable method and taking out the muck, mud and other debris from WCs and the sewage line cleaning with fresh water & removing the debris upto a distance exceeding 200M and not exceeding 250M and covering the same with a layer of soil not less than 15cm thick complete all as specified and as directed.(b) Cleaning and clearing of blocked chocked floor trap in kitchen and bathrooms including gully trap, the waste water line connection etc by rodding or by any other suitable method and taking out the debris to a distance exceeding 200m & not exceeding 250m and covering the same with a layer of soil not less than 15cm thick and drain out the floors taps, gully traps waste pipe and soil pipe with fresh water etc complete all as specified and as directed.Note:-(i)Adequate number of workmen shall be deployed as and when complain received for immediate execution.If any complaint not attend by the contractor within a day then a sum of Rs. 50.00 will be recovered against per complain per day from the contractor.(ii)Rate quoted above shall be deemed to including the cost of adequate T&P, equipment, safety devices etc(iii) Proper records (date wise) of complaints received & rectified by the contractor and attendance register of trademen shall be maintained and shall be produced for verification at the time of payment of each RAR/Bill. |
| 29 | Taking out liquid/solid content from manhole/sump/septic tank of any size any depth by super succer machine or high pressure pump, cleaning throughly including disposal of liquid/solid content out of the Cantt Area and covering with a layer of soil not less than 15cm thick complete all as specified and as directed. |
| 30 | S&F in repair Bib tap standard of PTMT any colour high pressure screwed for iron pipe and fixed. (Minimum weight 15mm-90gms/20mm 125gms) complete all as specified and directed |
| 31 | S&F in repairsPVC gully traps, square 125/110mm sizewith grating including jointing to waste pipe in cement joint, dia of outlet 100mm complete all as specified and directed. |
| 32 | S&F in repairs cast iron floor/Nahani trap with grating 100mm diaincluding jointing to waste pipe fixed in cement concrete type (1:2:4) type B-1 including removing old traps complete all as specified and as directed. |
| 33 | M&L for providing precast RCC (1:2:4) type B1 using 20 mm graded stone aggregate in Manholes covers set in CM 1:4 incl dismantling old RCC cover complete all as specified and as directed. |
| 34 | S&F MS TMT bars upto 10mm dia cut to length, bent to shape required including cranking, bending , binding, hooking ends abd binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and as directed. |
| 35 | S&F in repair PVC (SWR) bends plain 110 mm bore complete all as specified and as directed. |
| 36 | S&F in repair PVC(SWR) bends plain 75mm bore complete all as specified and as directed. |
| 37 | S&F PVC (SWR) bends with oval access door of 110 mm bore complete all as specified and as directed. |
| 38 | S&F in repair PVC (SWR) bends with oval access door of 75 mm bore complete all as specified and as directed. |
| 39 | S&F in repair PVC SWR Branch piece single(Single Y) equal or unequal 110mm dia with door access complete all as specified and as directed. |
| 40 | S&F in repair PVC SWR Branch piece single(Single Y) equal or unequal 75 mm dia with door access complete all as specified and as directed. |
| 41 | S&F in repair PVC (SWR) of 110mm dia junction single (single \"T\")equal or unequal with door access complete all as specified and as directed. |
| 42 | S&F in repair PVC (SWR) of 75 mm dia junction single (single \"T\")equal or unequal with door access complete all as specified and as directed. |
| 43 | S&F in repairfor 110 mm dia PVC SWRvent cowl complete all as specified and as directed. |
| 44 | S&F in repair for 75mm dia PVC SWRvent cowl complete all as specified and as directed. |
| 45 | Supply & Fixing MS work inposts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165 complete all as specified and as directed. |
| 46 | Supply & Fixing MSframed work such as grills, gratings, etc. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work con- forming to Fe.290.Gde-E-165 complete including dismantling of old steel/iron all as specified and as directed. |
| 47 | Supply & Fixing MSframed work such as framed and hung as gates, including pintle hinges, stops, hand-made sliding bolts, etcwith ends of bars shouldered and/or riveted, or forged into spikes and similar work con- forming to Fe.290.Gde-E-165including dismantling of old steel/iron complete all as specified and as directed. |
| 48 | Supply and fixed in repairs, vitreous china, (1st quality) WHITE Squatting pan ,\"Orissa\" pattern size 580 mm x 440mm with integral footrests water closet) with \"P\" or \"S\" trap front or back inlet complete including lime concrete for bedding, connection to drain pipe and to flushing pipe , anti syphonage pipe etc complete all as specified |
| 49 | Supply and fixed in repairs, vitreous China, (1st quality), wash down water closet pan ( padestal pattern Water Closet, white), (excluding fixing bolts, flushing cistern and flush pipe) , including connection to drain ( or outgoing pipe) and to flushing pipe, etc., complete all as specified. |
| 50 | Dismantling floor, hearth or wall tiling including cement mortar bedding ( but not backing),and removing serviceable tiles to store and rubbish off the permises and complete all as specified and as directed. |
| 51 | Material and labour for Non Skid ceramic coloured tiles (1st quality) 7 to 8mm thick ( square/ rectangular) area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors and vertical as skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match as specified and as directed) |
| 52 | Material and labour for Glazed ceramic tiles in vertical surface 450X 350X 7mm thick set and jointed in neat cement slurry and pointed in coloured cement to match over 10 mm thick screeding in CM 1:4 complete all as specified and directed |
| 53 | Supply and fixing in repairs plastic water closet seat with cover, whiteclosed pattern withflat bottom, and cover and mild steel chromium plated or aluminised hinging devicecomplete all as specified and directed |
| 54 | S & F vitreous china urinals, bowl type flat back sioze 465 x 395 x 265 mm white with grating and urion for discharge pipe including providing and fixing plugs bedding against wall CM 1:2 complete fixed in repairs complete all as specified and directed |
| 55 | S&F in repair health faucet hose and hook complete all as specified and as directed |
| 56 | S&F in repair for Vitreous China bowl urinal flat back, size of 465 x 355 x 265 mm white (minimum), with grating and union for discharge pipe (excluding flushing cistern, flush pipe and waste pipe) butfixing plug bedding urinal against wall in cement mortar 1:2 securing urinal to plug with and including 60mm long brass screws pointing around urinal back in cement mortar including 15mm brass stop cock and waste coupling brass CP complete all as specified and as directed. |
| 57 | S&F for PVC low level flushing cistern 10litre capacity valveless,symphonic action type with inlet ball valve float and handle incl bracket PVC connection pipe and flush pipe of polyethylene of low or high density or PVC 32mm dia complete all as specified and as directed. |
| 58 | S&F Vitreous china premium/ 1st quality wash down water closet wall hung EWC/white/ ivory / off white ( Closed pattern incl all necessories like rag bolts / gel gasket etc. including flushing cistern & flush pipe) complete in all respect all as specified and as directed.. |
| 59 | Demolation of cement concrete (unreinforced) in ground floor and pavings n exc 15cm thickness(below or above ground level) etc. all as specified and as directed. |
| 60 | M&L 75 mm thick PCC 1:4:8 Type D-2 (Using 20 mm Graded aggregate) as sub base.complete all as specified and directed |
| 61 | M&L for 40mm thick PCC 1:2:4 type B1 (using 20mm graded stone agg) as in floor etc. complete all as specified and as directed. |
| 62 | M&L Chequered cement concrete tiles 20cm x 20cm x 25mm thick, set, jointed and pointed in neat cement slurry 1:4 in floors with white cement and pigment complete all as specified and as directed. |
| 63 | M&LSand filling under floors /foundation including watering and consolidationcompleteall as specified and as directed. |
| 64 | M&L machine precast concrete interlocking paver block any shape size and colour confirming to IS- 15658-2006 of 60mm thickness, M-35 grade complete all as specified and as directed. |
| 65 | Dismantling posts or struts(wood,steel or RCC) any section embedded in concrete, brick work masonery etc including taking out embedded portion concrete ,brick work masonary work etc and making good distuebed ground complete all as specified and as directed. |
| 66 | Dismantling fencing wiremesh,any type any size complete including barbed wire etc all as specified and as directed. |
| 67 | M&L for PCC 1:3:6 type C-2 in fdn filling and mass concrete complete all as specified and as directed. |
| 68 | M&L for angle iron as in fencing post, incl cutting tops to shape as directed,drilling holes, notching for wire etc flat iron fillets(for securing wire mess) including all necessary drilling, bolting or reveting etc. |
| 69 | Supply only chain link MS galvanised fencing as specified. |
| 70 | Fixing only chain link fencing including line wires and mesh size type of standars,rails straining bolts etc complete all as specified and as directed. |
| 71 | M&L for mild steel round bars 10mm dia and over cut to length bent to shape required and fixing as required in fencing complete all as specified and directed . |
| 72 | S&F MS bolts machine made with hexagonal or square head one end and screwed the other or screwed both end n exc 5cm long 12mm dia complete all as specified and directed |
| 73 | M&L two coat of synthetic enamel paint to steel surface over a coat of red oxide primer n exc 10cm width or grith including preparation of new surfaces complete all as specified and directed |
| 74 | M&L two coat of synthetic enamel paint to steel surface over a coat of red oxide primer exc 10cm width or grith including preparation of new surfaces.complete all as specified and directed |