|
| 1 | Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches |
| 2 | Centering and shuttering for C.C work in toe wall bed C.C etc i/c cost of all material, T&P etc complete. |
| 3 | Centering and shuttering of R.C.C work as Raft, Slab, Abutment, Pier and wings etc. including cost of all material, T&P etc. complete. |
| 4 | C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size For below bed, floor, sleepers lining etc. Including cost of all Materials, Labour, T&P. etc. Complete. |
| 5 | Ist Class Brick work in 1:4 cement and sand mortar i/c all cost material, labour T&P etc complete. |
| 6 | C.C. M-10 (1:3:6) with Cement & Stone grit 4 mm to 20 mm size For below Approch slab etc. Including cost of all Materials, Labour, T&P. etc. Complete. |
| 7 | C.C. 1:6:12 filling in gaps between abutment and wing wall. Including cost of all Materials, Labour, T&P. etc. Complete. |
| 8 | R.C.C. (M-25 grade) 1:1:2 In main slab, approach slab, crash barrier etc. Including cost of all materials, labour and T&P etc. all completion of work. |
| 9 | Supply & placing Tarfet bearing for slab i/c cost of all maerial, labour T&P etc complete. |
| 10 | Providing and fixing of expansion joint with Angle iron 65x65x6mm with M.S Flat 32x6mm filled with bitumin and stone dust including Cost of all Materials , labour, T&P etc. required for proper complition of work. |
| 11 | R.C.C. (M-30 grade) In wearing coat etc.Including cost of all materials, labour and T&P etc. all completion of work. |
| 12 | Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete. |
| 13 | Supplying and Fixing 75 MM dia 0.60 M Length G.I Pipe in draining Spoit I/C Cost of all Materials , labour, T&P etc. required for proper complition of work. |
| 14 | Filling up sealing compound or making contraction joint including cost of all Material,labour and T&P etc. Complete. |
| 15 | Supplying and Fixing Wheel guard of size 150x150x900mm I/C Cost of all Materials , labour, T&P etc. Complete. |
| 16 | Struck deep cement pointing in 1:2 C.M /Sqm including cost of all material & required for completion of work as directed by Engineer-in-charge. |
| 17 | Laying Non cohesive/Cohesion less (ordanary sand) back filling adjoing the RCC structure. including cost of all labour and T&P.etc. complete. |
| 18 | Earth work in filling for making road and lifiting the level of road to vrb level upto 1.00 km by power transport i/c cost of all materials, labour, T&P etc. required for proper completion of work. |
| 19 | Supply and Laying of R.B.M in approch slab and approach road. i/c cost of all materials, labour, T&P etc. required for proper completion of work. |
| 20 | Providing & Laying brick on eadge soling on diversion and aproch road etc. including cost of material, labour and T&P etc. complete. |
| 21 | Making and fixing sign board (1.50MX1.00M) at site of work and including cost of all labour and T&P.etc. complete Please Enable Macros to View BoQ information |