| 1 | Cleaning the Scrub jungle including all labour charges for burryingng and burning etc., Clearing and grubbing road land including uprooting wild vegeration, grass, bushes, scrubs, saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceative materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. |
| 2 | At road portion |
| 3 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Box Cutting for Widening Portion and as per MORTH No. 111, 112, 301, 302. |
| 4 | At road portion |
| 5 | Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers |
| 6 | At road portion |
| 7 | Provding and Laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900. |
| 8 | At road portion |
| 9 | Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg / sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502, 900 |
| 10 | At road portion |
| 11 | Providing and applying Tack Coat over granular surface treated with primer using Bitumen Emulsion (RS- type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900. |
| 12 | At road portion |
| 13 | Providing and laying 50mm consolidated thicj Bituminous Macadam using 0.20 cum of 26.50-Providing and laying 50mm consolidated thick of 2.36mm & below size IRC metal with 37 kgs of VG 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum cost and conveyance of all materials to CMP site. 30 grade bitumen for premixing per 10sqm including heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory roller to the required density etc. including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc. complete as per specification using CMP as per clause 505 of WORTH rey-5 |
| 14 | At road portion |
| 15 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36mm & below size IRC metal with 50.30kgs of VG 30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory roller to the required density etc. including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc. complete as per specification using CMP as per clause 505 of MORTH rev-5. |
| 16 | At road portion |
| 17 | Provision for HM, Km Stone Charges etc complete |
| 18 | HM Stone |
| 19 | KM Stone |
| 20 | Provision for Name board |
| 21 | Provision for Sign board |
| 22 | Road Marking with hot applied thermoplastic compund with reflectorising glass base on bituminouse surface |
| 23 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |