| 1 | Providing, laying, spreading and compacting stone aggregate of specifie size to water bound macadam (G-2) specification including spreading in uniform thickness hand packing, Rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per techical specification clause 405. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 2 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 3 | Providing and applying primer coat with bitumen emulsion (Hincol) (SS1 HDPE) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means as per Clause 502.(Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 4 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom .Technical Specification Clause 503.(Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 5 | Providing, laying and rolling of open graded premix carpet of 20 mm Thickness composed of 13.2mm to 5.6mm Aggregates either using vg-10 penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat . (Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 6 | Providing and laying seal coat sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using type-C as per technical specification Clause 510. (Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from barrow pits with all lead and lifts, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 as per TS clause 303.1. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 8 | Construction of 600 mm dia hume pipe culvert.:-Excavation in foundation in ordinary soil including lift upto 1.5M. and lead upto 30M. including watering ramming and dressing etc. and disposal of surplus earth as direction by E/I. upto a distance of 30M. from the foundation trenches complete in all respect. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 9 | Construction of 600 mm dia hume pipe culvert.:-PC.C. 1:3:6 cement, coarse sand 40mm. Gauge stone ballast including complete work . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 10 | Construction of 600 mm dia hume pipe culvert.:-Supply of 600mm. Dia pipe. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 11 | Construction of 600 mm dia hume pipe culvert.:-Laying of 600mm. Dia pipe. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 12 | Construction of 600 mm dia hume pipe culvert.:-M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth etc. required for proper completion of the work. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 13 | Construction of 600 mm dia hume pipe culvert.:-Struck cement pointing in 1:3 cement fine sand mortar including supply of all materials labour tools and plants etc. required for proper completion of the work.(Flus Pointing). (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 14 | Construction of 600 mm dia hume pipe culvert.:-12 mm thick Plaster with Cement mortor in proportion of 1:2 cement and Coarse sand . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 15 | Construction of 600 mm dia hume pipe culvert.:-Painting Roofs or others work in one coat coat of ready mixed paint primer one coat coat of appproved paint(british ,Antisol) including supply of all materials laboure tools and plantsetx required for proper complition of the work As per direction of E/I. SI N0 04. . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 16 | Construction of 600 mm dia hume pipe culvert.:-Colour washing one coat using approved colouring materials of buff,blue,gray or broun shade including supply of all materials labour tools and plants etc. required for proper completion of the work. . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 17 | Construction of 600 mm dia hume pipe culvert.:-Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. Please Enable Macros to View BoQ information |