|
| 1 | Carrying out civil construction material laboratory works like supervisingof 1) sample collection 2) Testing of various construction materials in Laboratory, preparation ofresults, Graphs, report etc. for each conducted test overall as directed by Engineer-in-Charge. Note : (1)Each Job shall be carried out by one qualified Degree holder in Civil Engineering from University / Autonomous Govt. with 2 (Two) years relevant experience in testing (civil construction material) laboratory or Diploma holder in Civil Engineering from Board of Technical Educations / Govt. recognized Polytechnic with 5 (five) years relevant experience in testing (civil construction material) laboratory .(2) Deployment: The contractor shall deploy one person for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintenance work, where samples need to drawn, the person will have to stay longer time occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work : The contractor shall carry out number of one(1) / two(2) jobs per monthas per requirement atQA Laboratoryand as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one person exclusively for the particular job.(5) Person should be engaged after scrutiny of Engineer -in-charge of BARC(V) and approved by Competent authority.The deployed person will report to Engineer -in-charge of BARC(V). (6) The minimum notice period before change of Person is 30 days, failing which a compensation of Rs.3,000/- per day of shortfall in serving the notice period will be levied on the contractor. |
| 2 | Carrying out civil construction material laboratory works including supervisingof 1)sample collection 2) Chemical testing on various construction materials in Laboratory, preparation ofresults, Graphs, report etc. for each conducted test overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified person of 2 years with M.Sc Chemistry acquired fromGovernment recognisedUniversity/ Autonomouswith 2 (two) yearsrelevant (Chemical) experience in testing (civil construction material) laboratory or 3 year course in B.Sc. with Physics, Chemistry & Mathematics as subjectsacquired fromGovernment recognisedUniversity/ Autonomouswith 3 (three) yearsrelevant (Chemical) experience in testing (civil construction material) laboratory or Diploma in Chemical Engineering acquired from Board of Technical Educations / Govtrecognized Polytechnic with 5 (five) years relevant (Chemical) experience in testing (civil construction material) laboratory.(2) Deployment: The contractor shall deploy one person for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintenance work, where samples need to drawn, the person will have to stay longer time occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work : The contractor shall carry out number of one(1) / two(2) jobs per monthas per requirement atQA Laboratoryand as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one person exclusively for the particular job.(5) Person should be engaged after scrutiny of Engineer -in-charge of BARC(V) and approved by Competent authority.The deployed person will report to Engineer -in-charge of BARC(V). (6) The minimum notice period before change of Person is 30 days, failing which a compensation of Rs. 2500/- per day of shortfall in serving the notice period will be levied on the contractor. |
| 3 | Carrying out civil construction materiallaboratory works like 1) sample collection 2) testing for various construction materials in laboratary, assistance in preparation ofresults, Graphs, report for each conducted test overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified person having minimum Intermediate/10+2 from State Board of secondary and intermediate education board/CBSE with3 years (Three)relevant experience in testing (civil construction material) laboratory.(2) Deployment: The contractor shall deploy one Personfor each job as single day work, 6 working days in weekfor minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintenance work, the person will have to stay longer time occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account.(3) Period of work : The contractor shall carry out number of one(1) / two(2) jobs per day as per requirement atQA Laboratoryand as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one person exclusively for the particular job.(5) Person should be engaged after scrutiny Engineer -in-charge, of BARC(V)and approved by Competent authority. The deployed person will report to Engineer -in-charge of BARC(V). (6) The minimum notice period before change of Person is 30 days, failing which a compensation of Rs. 2,100/- per day of shortfall in serving the notice period will be levied on the contractor. |
| 4 | Carrying out civil construction materiallaboratory works like 1) daily checking of machines/ equipments 2) Necessary repairs 3) testing for various materials in laboratary,assistance in preparation ofresults,Graphs, report for each conducted test etc. overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified Technician having minimum SSCand Trade certificateinFitter not less than one year course duration from ITI/Government Recognised Vocational Training Institute with3 years (Three)relevant experience in testing (civil construction material) laboratory or workshop maintenance . (2) Deployment: The contractor shall deploy one Technicianfor each job as single day work, 6 working days in weekfor minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintenance work, the person will have to stay longer time occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account.(3) Period of work : The contractor shall carry out number of one(1) / two(2) jobs per day as per requirement atQA Laboratoryand as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one person exclusively for the particular job.(5) Person should be engaged after scrutiny of Engineer -in-charge, of BARC(V)and approved by Competent authority. The deployed person will report to Engineer -in-charge of BARC(V). (6) The minimum notice period before change of Person is 30 days, failing which a compensation of Rs. 1,750/- per day of shortfall in serving the notice period will be levied on the contractor. |
| 5 | Carrying out loading/unloading of samples & Lab. materials/Equipments/apparartus, area cleaning, machine/Equipment/apparatus cleaning after conducting of tests and miscelaneous works of QA laboratory as per the instructions of EiC (Engineer-In-Charge). Note:(1) Each Job shall be carried out by one unskilled worker preferably having experience in testing (civil construction material)laboratory or construction site.(2) Deployment: The contractor shall deploy oneunskilled workerfor each job as single day work, 6 working days in weekfor minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintenance work, the person will have to stay longer time occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account.(3) Period of work : The contractor shall carry out number of one(1) / two(2) / three(3)/ four (4) jobs per dayas per requirement atQA Laboratoryand as directed by Engineer-in-Charge. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one unskilled worker exclusively for the particular job.(5) unskilled workershould be engaged after scrutiny of Engineer -in-charge, of BARC(V) and approved by Competent authority.The deployed person will report to Engineer -in-charge of BARC(V). (6) The minimum notice period before change of Person is 30 days, failing which a compensation of Rs. 1,400/- per day of shortfall in serving the notice period will be levied on the contractor. |
| 6 | Calibration Of Equipment |
| 7 | CTM & FTM : 3000 KN Compression Testing Machine Fully Automatic and100 KN capacity Flexural testing attachment. Name of the manufacturer - Hydraulic & Engineering Instruments Company (HEICO)CTM - Model No.:HLA 592.401FTM - Model No.:HE-SPLCalibration Range - Compression Testing Machine:0 KN to 500 KN with an increment of 50 KN0 KN to 3000 KN with an increment of 300 KN Flexural Testing Machine:0 KN to 100 KN with an increment of 10 KN Class of Machine Range - Special Calibration of Class 1 starting from 1% of the full range Note: 1. Calibration shall be carried out by the Original Equipment Manufacturer (OEM Calibration) only2. If Machine is found to be out of class-I range, it shall be be corrected by the OEM at no extra cost. |
| 8 | Chemicals (Grade : AR grade or Equivalent) |
| 9 | Mercury (Metal) - 99.99% pure |
| 10 | Bromophenol Blue Powder |
| 11 | Magnesium Sulphate Anhydrous (AR grade) |
| 12 | Orthophenonthrolein Indicator(1,10- Phenanthroline Hydrochloride) |
| 13 | Potassium Hydrogen Phthalate(CRM/SRM) |
| 14 | Sodium Carbonate (CRM/SRM) |
| 15 | Sodium Chloride (CRM/SRM) |
| 16 | Sodium Diphenylamine Sulphonate |
| 17 | Sodium Sulphate Anhydrous |
| 18 | Thymol Phthalexone Indicator / Thymol Phthalein Complexone |
| 19 | Metacresol Purple Indicator solution - PH 8.3 indicator |
| 20 | Amberlite IR-120 or Equivalent - Ion exchange Resin |
| 21 | Glassware (Borosilicate glass) & Accessories |
| 22 | Ash less filter paper (whatman No:40) - Pack of 100 No |
| 23 | Ash less filter paper (whatman No:41) - Pack of 100 No |
| 24 | Ash less filter paper (whatman No:42) - Pack of 100 No |
| 25 | Glass fibre filter disc (whatman GF/C) - Pack of 100 No |
| 26 | Desiccator 300 mm Dia. (Borolisicate Glass) |
| 27 | Filter paper grade 1A (Pack of 25) |
| 28 | Silica Crucible with lid 25 ml |
| 29 | Silica Crucible with lid 50 ml |
| 30 | Bottle Shaker (Mechanical shaker) |
| 31 | Hardware Items |
| 32 | G.I. tray - 600 mm x 400 mm x 50 mm |
| 33 | Shuttering oil |