| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. . Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. |
| 2 | Cement Concrete Pavement M-30 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 53 grade cement @ 350 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 3 | Construction of Divider.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level : 1:1 1/2 :3 ( 1 Cement : 1 1/2 coarse sand : 3 graded stone aggregate 20 mm nominal size).. |
| 4 | Construction of Divider.Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters,buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out |
| 6 | Supplying and filling in plinth with Local sand under floors, including watering, ramming, consolidating and dressing complete. |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bar. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 13 | 6 mm cement plaster of mix 1:3 (1 cement:3 fine sand) |
| 14 | Neat cement punning |
| 15 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 16 | Structural steel work in single section fixed with or without connecting plate including cutting hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 17 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |