| 1 | WW/CW/Painting work of Govt. Resi. Qtrs. In 45 bunglow under M-2 Sub Dn, PWD Bhopal Please Enable Macros to View BoQ information Bill of Quantities (BOQ) Name of work : WW/CW/Painting work of Govt. Resi. Qtrs. In 45 bunglow under M-2 Sub Dn, PWD Bhopal Probable Amount of contract : (Rs. in Figures) : Rs. 25.00 Lacs (Rs in words) : Rupees Time Alloved : 06 months SNo SOR Item Particulers of Item Unit Qty. Rate Remark |
| 2 | 14.1 joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead : With cement mortar 1:4 (1 cement : 4 sand). |
| 3 | 14.26 14.26.1 two or more coats sqm 7.0 14.26.2 one or more coats sqm 4.0 |
| 4 | 14.27 |
| 5 | 14.28 |
| 6 | 14.29 |
| 7 | 14.31 |
| 8 | 14.32 14.32.1 75 mm diameter pipes meter 9.0 14.32.2 100 mm diameter pipes meter 11.0 14.32.3 150 mm diameter pipes meter 17.0 |
| 9 | 14.33 14.33.1 75 mm diameter pipes meter 21.0 14.33.2 100 mm diameter pipes meter 31.0 14.33.3 150 mm diameter pipes meter 46.0 |
| 10 | 14.34 14.34.1 75 mm diameter pipes meter 10.0 14.34.2 100 mm diameter pipes meter 13.0 14.34.3 150 mm diameter pipes meter 19.0 |
| 11 | 14.35 |
| 12 | 14.36 |
| 13 | 14.37 |
| 14 | 14.38 |
| 15 | 14.41 |
| 16 | 14.42 |
| 17 | 14.43 14.43.1 One or more coats on old work. sqm 674.0 |
| 18 | 14.44 14.44.1 Old work sqm 28.0 |
| 19 | 14.46 |
| 20 | 14.48 |
| 21 | 14.49 14.49.1 Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 liters/10 sqm complete including cost of Priming coat. sqm 42.0 14.49.2 Old work (one or more coats @ 2.20 kg/10 sqm) complete. sqm 30.0 |
| 22 | 14.51 14.51.1 Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). sqm 13800.0 87.0 14.51.2 Old work (One or more coat applied @ 0.90 ltr/10 sqm). sqm 52.0 |
| 23 | 14.52 14.52.1 Old work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement paint surface. sqm 65.0 14.52.2 Old work (one or more coats applied @ 0.83 ltr/10 sqm). sqm 41.0 |
| 24 | 14.53 14.53.1 One or more coats applied on walls @ 0.85 ltr/10 sqm. sqm 58.0 14.53.2 Painting wood work with Deluxe Multi Surface Paint of required shade. One or more coat applied @0.70 ltr/10 sqm sqm 52.0 14.53.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. One or more coat applied @0.70 ltr/10 sqm. sqm 52.0 |
| 25 | 14.54 14.54.1 One or more coats with copal varnish. sqm 32.0 14.54.2 One or more coats with spar varnish. sqm 33.0 |
| 26 | 14.55 |
| 27 | 14.56 |
| 28 | 14.57 |
| 29 | 14.62 14.62.1 (one or more coats) sqm 9.0 14.62.2 (two or more coats) sqm 11.0 |
| 30 | 14.73 |
| 31 | 13.41 |
| 32 | 13.42 |
| 33 | 13.48 13.48.1 One coat. sqm 37.0 13.48.2 Two coats. sqm 56.0 |
| 34 | 13.49 |
| 35 | 13.55 13.55.1 One coat sqm 63.0 13.55.2 Two coats sqm 101.0 |
| 36 | 13.66 13.66.1 One coat. sqm 35.0 13.66.2 Two coats. sqm 53.0 |
| 37 | 13.67 13.67.1 With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre. sqm 28.0 13.67.2 With ready mixed red oxide zinc chromatic on steel/ iron works having VOC content less than 250 grams/litre. sqm 24.0 13.67.3 With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre. sqm 10500.0 24.0 Note 1 – Including other item ( if required ) of SHEDULE OF RATES (SOR) For BUILDING WORKS in force from January, 1st 2024, of Engineer-In-Chief (Building) M.P. Public Works Department M.P.BHOPAL ( Volume- I & II ) Note2 –The quatntities given for Special repairs, if exceeds, as compared to BOQ will execute under annual repairs. Sub Engineer Sub Divisional Officer Executive Engineer Sec. P.W.D. M-2 Sub Dn. P.W.D. New Bhopal Division Bhopal Bhopal. |