|
| 1 | Transporation, , installation ,dimantling of rig machine and logging of bore hole. |
| 2 | Drilling of bore of 600mm dia (with pilot) bore , GL to 100 MBGL 600mm dia bore |
| 3 | 101 to160 MBGL 600mm dia bore |
| 4 | logging of bore hole by departmental/approved electric logger |
| 5 | Zone testing in water quality problem ares including all required material , labour, T&P etc complete in all respect |
| 6 | MS tube well assembly with all required parts like plane pipe, slotted pipe(as required up to 50% of plane pipe), rings, wall cap, bail plug, clamp, reducer, Central guide , support structure etc. as required @ as per typed design complete in all aspect-300 mm dia |
| 7 | Lowering of Tube well assembly of 300 mm Dia size with shrouding of pea gravel,GL to 100 MBGL(300mm dia) |
| 8 | GL to 140 MBGL(300mm dia) |
| 9 | Transportaion, installtion, dismantling of 250/350/600psi Compressor |
| 10 | Charges of development by 250 Psi Compressor per hour |
| 11 | Transportaton, dismantling , eraction of 1Cuses/3Cuses OP United yield test |
| 12 | Charges of development by 3Cusec O.P Unit Yiled test |
| 13 | Supply of lal Kuan pea gravel sizer of 1.6mm to 4.8 mm which is to be used during lowering of tube well assembly and development of tube well |
| 14 | S.I.T.C of pumping plant including Stator, Control panel, cabel complete in all respect with all required material T&P , labour etc. 17.50HP |
| 15 | S.I.T.C Main piping & valves with 24 mtr column pipe, electronic type chlorinatring plant with wiring of pump house (internal & external) complete in all respect with required material, T&P labour, Chain Pulley and gauges 100mm dia |
| 16 | Additional column pipe in 3m length |
| 17 | power connection from UPPCL 15KW(three phase T/F) |
| 18 | Construction of room 3.60*3.60 size |
| 19 | add 18% GST Please Enable Macros to View BoQ information |