|
| 1 | TRANSPORTATION |
| 2 | Carting of boring machine and compressor & materials casting pipe & capping set T&P from site and return of above after completion of work. |
| 3 | 2 Supply of tubewell assembly |
| 4 | 300 mm ERW hoursing pipe 7.10 mm es per 155 4270 |
| 5 | 200 mm ERW hoursing pipe 7.10 mm M 5 Plain pipe |
| 6 | 200 mm ERW slotted hoursing pipe 7.10 mm M5 Plain pipe |
| 7 | 300 x 200 mm ms reducer |
| 8 | 200 mm ms ball plug |
| 9 | 300 mm ms clamp |
| 10 | 300 mm ms ring |
| 11 | 200 mm ms ring |
| 12 | 300 mm ms well cap |
| 13 | 200mm center guide |
| 14 | Election of RC600/27 rig m/c and clamp Equipage |
| 15 | Drilling of bore 600 mm dia bore GL to 60 mtr BGL |
| 16 | Driling of bore 550 mm dia bore 60 mtr to 120 mtr BGL |
| 17 | Drilling of bore 550 mm dia bore 60 mtr to 120 mtr to 200 intr BGL |
| 18 | Dismentling of rig m/c & comp equipage |
| 19 | Pea Gravel of suitable size for tube well including shrounding etc. |
| 20 | Arrangement of water by ordinary bore for drilling including pump set & Generator etc. |
| 21 | 300 mm dla housing pipe from GL. To 72 mtr BGL |
| 22 | 200 mm dia housing pipe from 72 mtr BGL to 122 mtr BGL |
| 23 | 200 mm dla plain/slotted housing pipe from 122 mtr BGL to162 mtr BGL |
| 24 | 200 mm dia plain/slolted housing pipe from 162 mtr BGL to200 mtr BGL |
| 25 | Clection of camp. Its T&P and clamp Equipage |
| 26 | Devlopment of testing of tubewell of air compressor |
| 27 | Dismentling of above |
| 28 | Erection of O.P. unit its T&P and camp Equipage |
| 29 | 5.5 Dismentling of above |
| 30 | 5.5 Devlopment of tubewell by O.P. unit |
| 31 | 5.7 Vield & vertically test |
| 32 | Supply & FIXING OF 35 HP motor pumps set 1000 LPM Supply & FIXING OF PUMPING PLANT WITH COLUMN PIPE AND VALVES ETC. mm dia column heavy duty. discharge head double cable IS1 mark length with 30 mtr. 150 |
| 33 | switch etc, with all material complete. Control panel with fuly automatic stardelta stater, L&T main |
| 34 | 6.3 Main piping & valves of kirloskar make 150 mm |
| 35 | feeding hypo chloride at 4kg/cm2 electrochemical type chlorinating plant with 100 ltr. Tank for Installation of pumping plant alongwith all accessories fittings, |
| 36 | 6.5 Chemical and Bacteriological test of water sample |
| 37 | G.6 Barricading of site Please Enable Macros to View BoQ information |