| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) |
| 2 | Making of Nala Bandha with sand bags. With local sand including etc. all complete. (Atached per Annalysis rate). |
| 3 | Providing and Fixing of Barricading of 100mm dia average ballies with in a distance of 1.50 meter for 3 rows of 3 Q, 3 nos of Cross ballies, two supporting ballies of 3 meter ballies and 2 nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (Material will be property of Contractor after dismantling). |
| 4 | Providing and Fixing close timbering in trenches on Both Side & all complete.(a) 0.00 To 3.00 M. (None Scheduled) |
| 5 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (NS) |
| 6 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 brick ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.SCH.-274) |
| 7 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-150 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter SI.No.279(a)) |
| 8 | Providing and Iaying NP-3 pipe RCC concrete pipe for culvert on first class in slngle row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900. (1200mm dia). (Chapter No.20 Si.No.10 (E)) |
| 9 | Class-150 brick work in 1:4 cement and coarse sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 S.I. No. 305) |
| 10 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) |
| 11 | Mild Steel work in built up tubular ( round, square or rectanglar hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying priming coat of approved steel perimer, including welding and bolted with special shaped washers etc. complete. (Chapter No.10 Si.No.1) |
| 12 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter Si.No.8) |
| 13 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 As per M.R.) |
| 14 | Sub Total |
| 15 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 16 | Grand Total Please Enable Macros to View BoQ information |