| 1 | Page-10, Item-2Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. |
| 2 | Page-10, Item-2Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. |
| 3 | IT -02 P - 01Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 4 | IT – 01 P - 14Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 5 | IT - 01P- 23Cement concrete with 30mm graded shingles excluding shuttering. (1:3:6) |
| 6 | It 33, P 41 Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.. (ii ) River Bazree |
| 7 | IT -03 P - 01Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)a)with earth obtained from excavation of foundation |
| 8 | IT -40 P 43Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I.SAIL/ TATA/RINL |
| 9 | IT - 36, P 42Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor), (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. |
| 10 | IT - 17, P 16125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 11 | It – 01 P 189Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar |
| 12 | IT-13 P104, MS or WI Ornamental grill of approved design joints continuously welded with MS/WI flats of bars of window, railing etc. Fitted and fixed with necessary screws and lugs in ground floor |
| 13 | IT-15 P 192Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 14 | IT – 01 P -200Priming one coat on steel or other metalled surface with synthetic enamel/oil bound primer of approved quality including smoothening surface by sand papering etc. |
| 15 | IT – 02 P -200Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using approved putty etc on the surface if necessary. With super gloss (hi-gloss) with any shade except white.(b) On steel or other metal surface with super gloss(hi-gloss). (a)(iv) Two coats (with any shade except white) (Same as item no 12 ) |
| 16 | IT -01 P - 194White washing including cleaning and smoothening surface thoroughly. |
| 17 | IT -04 P - 194 Colour washing with any shade with Stainers, as required includingcleaning and smoothening surface thoroughly : (ii) External surface (Ground floor) (b) Two coats (on new works only) (i) Other than yellow, pink |
| 18 | Page no: 261 Sl no: 09Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, anuring, applying presticide and fertilizer etc.i) Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm. |
| 19 | ii) Rangon chineese of size not less than 20cm |
| 20 | viii) China palm of leaves 4-5 in earthen pots size 25cm |
| 21 | x) Ficus blakii (F. Vivicon) well branched (Bushy) of height120cm - 135 cm in earthen pot of size 30cm. |
| 22 | xi) Ficus elastica Decora ( Rubber plant ) of height 90cm- 60cm in each earthen pot of size 25cm. |
| 23 | xii) Ficus infectoria (Pilikhan) of height 135cm-150cm in big Polybag of size 25cm-30cm |
| 24 | xiii) Ficus regnold well branched (bushy) of height 120cm-135cm in cement pots of size 35cm. |
| 25 | xv) Acalypha species (Red/Green) of height 30cm-90cm inearthen pots of size 20 cm. |
| 26 | xix) Bougainvillea (name variety, bushy plants, full bloom) ofheight 90cm-60cm in cement pots of size 30cm. |
| 27 | xxii) Croton different varieties of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 28 | xxvi) Areca Palm 4 - 5 suckers of height 90 cm to 105 cm in earthen pots of size 25 cm. |
| 29 | xxviii) Dracaena (Mahatma) of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 30 | xxxiii) Dracaena Reflexa of height 30 cm to 90 cm in earthen pots of size 20 cm. |
| 31 | xxxiii) Jhau Tree of height 30 cm to 90 cm in plastic bag |
| 32 | Construction of display board with Marble Sone/ Granite Stone with lettering and fitting fixing at wall incuding all complete. (size : 750 mm x 600 mm) |
| 33 | Add:- GST @ 18% |
| 34 | Add:- Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |