| 1 | Supply of following decentralised materials as per RESSPO/PuVVNL norms at the work site. |
| 2 | 11 KV CABLE JOINTING KIT 3X70 MM ² O/D |
| 3 | 33 KV CABLE JOINTING KIT 3X300 MM ² O/D |
| 4 | PG CLAMP FOR DOG |
| 5 | DANGER BOARD WITH CLAMP WITH NUT & BOLT |
| 6 | GI BARBED WIRE |
| 7 | NUT & BOLT DIFFERENT SIZES |
| 8 | 33 KV F BRACKET FOR ST POLE 11 MTR WITH NUT & BOLT |
| 9 | GI PIPE 6\" DIA |
| 10 | BRASSING ANGL CLAMP, HOLDING CLAMP FOR X-ARM, TOP CHANNEL CLAMP, HOKING CLAMP FOR PIPE, CLAMP FOR DROPER |
| 11 | Shifting,loading ,carriage& unloading of following materials on private truck at store centre Ballia & Un-loading of the same with proper stacking at work site . |
| 12 | S.T. Pole 11 M long IS-410 SP-55 |
| 13 | S.T. Pole 13 M long. |
| 14 | PCC. Pole 8.5 M long. |
| 15 | ACSR ‘Dog’ Conductor |
| 16 | 33 KV ‘XLPE’ Cable 3x300mm² mtr |
| 17 | 11 KV ‘XLPE’ Cable 3x70mm² mtr |
| 18 | OTHER MATERIALS ( X ARM, STAY EARTHING, DISC INSULATOR etc.) |
| 19 | 11 KV VCB WITH CONTROL PANNEL OFR SINGLE T/F CONTROL PANNEL & CT 200/100/1A WITH STRUCTURE & PT O/D 33/110 V WITH STRUCTURE. |
| 20 | Work of following materials as per RESSPO/PuVVNL norms at the work site. |
| 21 | Erection of Single pole structure on 11 mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, & fitting of all accessories ( \"V\" type cross arm 100 x 50 x 6 mm,/side arm with clamps with bolt and nut, composite polymer pin, insulator. complete as per RESSPO Norms) and Erection of Double/ Four / Tri pole structure on 11 Mtr ST Pole including all works of evocation of pit, pole erection & fitting of all accessories top channel 125 x 65 x 3200 mm with clamps complete,disc insulater with fitting,etc as per RESSPO Norms) as per site requarment. |
| 22 | Erection of Single pole structure on 13 mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, & fitting of all accessories ( \"V\" type cross arm 100 x 50 x 6 mm,/side arm with clamps with bolt and nut, composite polymer pin, insulator. complete as per RESSPO Norms) and Erection of Double/ Four / Tri pole structure on 13 Mtr ST Pole including all works of evocation of pit, pole erection & fitting of all accessories top channel 125 x 65 x 3200 mm with clamps complete,disc insulater with fitting,etc as per RESSPO Norms) as per site requarment. |
| 23 | Erection of Single pole structure on 8.5 mtr PCC Pole including all works of evocation of pit, pole erection, & fitting of all accessories ( \"V\" type cross arm 100 x 50 x 6 mm,/side arm with clamps with bolt and nut, composite polymer pin, insulator. complete as per RESSPO Norms) and Erection of Double pole structure on 8.5 mtr Pcc Pole including all works of evocation of pit, pole erection & fitting of all accessories top channel 125 x 65 x 3200 mm with clamps complete,disc insulater with fitting,etc as per RESSPO Norms) as per site requarment. |
| 24 | Instalation of VCB with Control Pannel, C.T. 200/100/1A including all works & fitting of all accessories etc as per RESSPO Norms) . |
| 25 | Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. |
| 26 | Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per RESSPO Norms |
| 27 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. ( Rate as per site due to heavy tree branches cuttung, loading ,carriage and unloading of tree branches from work site to forest department site store/office) |
| 28 | Jointing charges of 11 KV CABLE JOINTING KIT 3X70 MM ² O/D |
| 29 | Jointing charges of 33 KV CABLE JOINTING KIT 3X300 MM ² O/D |
| 30 | Laying of 11KV ‘XLPE’ cable in air Complete work. |
| 31 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) of Double cable by digging pit & making trench in Proper size(1.2M depth x1M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks/ HDD Method as per site required. |
| 32 | Laying of 33KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3.5 m long Complete work. |
| 33 | Earthing of Outdoor Structure and Equipments |
| 34 | Earthing of I/D Equipments |
| 35 | Switch yard lighting and aproach road |
| 36 | Painting of all structure & Equipments. |
| 37 | Earthing of poles by MS earthing rod 20x2500 mm with GI Wire as per RESSPO Norms |
| 38 | Concriting of poles as per RESSPO Norms |
| 39 | Making plinth for Poles as per RESSPO Norms |
| 40 | Fixing of danger boards on poles as per RESSPO Norms |
| 41 | Fixing of Barbed wire on poles as per RESSPO Norms |
| 42 | Painting of ST Poles as per RESSPO Norms by red oxide paint & Alluminium paint by two coats . |
| 43 | Fitting of 33 KV MS Bracing angle on Double pole , TRI-Pole & four Pole |
| 44 | Fixing of PG Clamps Please Enable Macros to View BoQ information |