| 1 | Description of Wroks |
| 2 | The provision made for the excavation and levelling the ground by the removing the hard surface of the base preparation for the laying base for the plain cement concrete with the care to be required as the work located at the Archaeological site for the excavation the site the experience working staff with strict supervision with slow process and excavation by the manual exactly levelling, the base as per the level site preparing the base for the flooring as per the site work site of the pathway leading to vinchukada , mahadev temple and site locations,as directed by the work incharge and the removal and shifting the excavated material beyond the area of forts which are shifted by the head load, lead and lift of the excavated material etc. complete as directed by the work incharge. |
| 3 | The provision made for the levelling the ground compaction, shifting the murum for the base of the Plain Cement Concrete the murum shifted the within the 700mtr of the site as directed by the work incharges, the levelling, compaction of the murum with the using the hand compactor to achieve the 100% compaction and the screening the materials, such as the required for the compaction. The base as per the level site preparing the base for the flooring as per the site work site of the pathway leading to vinchukada , mahadev temple and site location directed by the work incharge as the available murum required its required to screening with the large stone & separated the murum. watering the mixing and sprinkling the water achieve the maximum density etc. complete. as directed by the work incharge. |
| 4 | Providing and laying plain cement concretewith the proportional mix with volume of the ratio as 1:2:4 with the controlled water cement ratio on the site which the inclusion of the well graded basalt stone aggregate and the sand which properlygraded as per the standard , and basalt stone aggregate and sand from the approved source of quarry which the rate inclusion of the headload , including the shifting the material from the foot of the hill to the work site of the pathway leading tovinchukada , mahadev temple and site location directed by the work in charge, in case of require to shift the water to work site, as the entrance the required locations to stack the material such without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours strict the lane and placing of the concrete with the proper levelling as per the slope and level as directed by the work incharge , the curing required to achieve with jutebags with proper process as per the required forthe curing period and the shifting of the water for curingas perthe directed by the work inchargeetc complete. |
| 5 | The provision for removal of debris and levelling the material and as the site is the Archaeological site the debris required to proper screening under the supervision of the ASI staff with the removal of the debris which is the scientific debris clearance , and the shifting the material at directed by the work in charge and levelling the surface with proper slope and the compaction, the screening materialand stacking use full material at the site as the directed by the work in charge, the lead and lift of the material by the head load, the shifting without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours, the stacking the material as directed by the work incharge. |
| 6 | The provision for the construction of the uncoursed rubber massonery for the protection wall in the cement mortar mix on the volume basic of the1:5with control water cement ratio on the site, which included well graded sand as per the standard the uncoursed rubber of the basalt stone as per the standard and the well facedbasalt stone and approved sources of the quarry, which rate inclusion the shifting of material from the foot of the hill to the work site leading tovinchkada, Mahadeo temple, Jain caves and site location directed by the work in charge required to shift the water for curing, the through stone required throughout the width of the wall.As the stack of the material atentrance the required location to stackand shifting of the material without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours. The proper finishing the surface with including the cement mortar 1:5 , the curing required to achieve with jute bags with proper process and as per requirement. As directed by the work in charge to complete. |
| 7 | The provision made for the desilting of ancient water cisterns at thecave areas to be required as the work located at the Archaeological site for the removal of silt from the ancient tank for the removal of silt experience staff with supervision with slow process and the manual removal and shifting and the screening with the standard sieve, separated the pebbles, important material and shifting the material as per the required location without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours as directed by the work incharge. |
| 8 | The provision made for laying and fixing the three line basalt stone for steps the edges of stones are proper perpendicular and vertical hand dressed of the size 0.4 x 0.30x0.20 m the basalt required to match with the previously fixed stones at the steps the stone with proper surface level, source of the stone from approved quarry, course and fixing in the volume ratio mix into the 1:4,of the cement and the well graded sand with as per the standard the mix of the mortar with control watercementratio, the inclusion of the shifting of the material from the foot of the hill to the work site leading at vinchukuda , mahadev temple,Jain caves As the directed by the work incharge also the require to shift the water & the shifting of the material without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours with proper finishing the surfacewith the proper level the steps stone surface as directed by the work in charge the pointing of the joints in cement mortar 1:4 if required and the rate inclusion of the site clearance with proper curing with jute bag etc complete. |
| 9 | The provision made for the fixing the two line of the hand dressedbasalt stonewith the stone of the size 0.40x0.30x0.15 m hand dressed of the basalt stone match the previous fixed stone at the landing of the steps the stone the edges and surface of stone proper perpendicular the proper levelling surface and from approved quarry and source and fixing in the volume ratio mix mortar into the 1:4 of cement and well graded sand with as per the standard of the mix of the mortar with controlled water cement ratio , the inclusion of shifting of the material from foot of hill to the work site leading to at the vinchukada, mahadev temple,Jain caves As the directed by the work in charge also the require to shift the water, in the shifting of the material without disturbing the visitors movement and safety and security of the visitors as well as workers, the carrying the material in low visitors hours and days timing hours. The surface of the stone flooring with proper finishing directed by the work incharge with inclusion of the pointing of the joints in cement mortar 1:4 if required and the rate inclusion of the site clearance with proper curing with jutebag,shifting of the water for the curingetc complete. |
| 10 | GST 18% of SL.No.1 to 8 |