| 1 | Construction of Retaining Wall at Narkadalkudi Kulam near Karuppanasamy Kovil Periya Suriyur in Suriyur Panchayat.Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 2 | Supplying and filling in basement with filling M-Sand in layer of not more than 15 cm thick well rammed etc., complete. |
| 3 | Cement concrete 1:4:8 mix ( one cement four m-sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 4 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X \"3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. |
| 5 | Cement concrete 1:3:6 mix ( one cement three m-sand and six aggregate ) using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 6 | Bhathing Ghat North side Near kulam.E Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 2 |
| 7 | Filling in foundation & basement with good m-sand including cost and conveyanceof all labour charges, sand slacking ramming etc., complete. |
| 8 | Cement concretein C M 1:4:8 mix using 40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., complete |
| 9 | Cement concrete 1:3:6 mix ( one cement three m-sand and six aggregate ) using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 10 | Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete |
| 11 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise and similar varieties with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three crushed stone M.Sand) fixing the slabs with required cement slurry and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., The granite stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 12 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. |
| 13 | Supplying and fixing of SS Hand Rail |
| 14 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete |
| 15 | Bhathing Ghat south side Near kulam.E Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 2 |
| 16 | Filling in foundation & basement with good m-sand including cost and conveyanceof all labour charges, sand slacking ramming etc., complete. |
| 17 | Cement concretein C M 1:4:8 mix using 40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., complete |
| 18 | Cement concrete 1:3:6 mix ( one cement three m-sand and six aggregate ) using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 19 | Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete |
| 20 | Brick work in CM 1:5 mix using country bricks metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., complete |
| 21 | Plastering in CM 1:5 mix,12mmthick metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by depth shoring shuttering balingout water etc., complete |
| 22 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete |
| 23 | Provision for Name Board |
| 24 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |