Name of Work:- Improvement Of Footpath By Interlocking Tiles From Baba Sanitary To Postoffice In Sarojni Nagar Ward 69 Under Zone 6.
Sl. No.
Item Description
1
Dismentling of Old interlocking tiles including material all complete.
2
Earth work in surface excavation not exceeding 30cm for road earth ordinary soil (Loan clay or sand) including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m.
3
Class-150 brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. etc all complete.
4
R.C.C works with 1:1.5:3 cement approved coarse sand and 2 cm (3/4\") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and neces necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete
5
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete.
6
construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete
7
Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500.\
8
p/L of cement concrete 1:2:4 cement & c sand incl mat all complete.
9
cartage of earth upto 3km including loading and unloading incl mat all complete.
10
TAX18% Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.