| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | GSB Grading-1Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as perTechincal Specification clause 401 |
| 3 | WBM Grade-3Providing, laying, spreading and compacting stone aggregates of 53mm to 22.4mm sizes (Crusher broken) to water bound macadam (WBM III) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(WBM III) |
| 4 | Construction of Subgrade and earthen shoulders with approoved soil with all the lifts and lead laying in layers ,breaking clods ,dressing to required lines , curves,grade and sections,watering and compaction to meet atleast 100% procter density completeto specification requirements as per technical specification clause 301.5 |
| 5 | Cement Concrete Pavement: Construction of un-reinforceced ,dowel jointed at expansion and consruction joint only, plai cement concrete pavement, thickness as per design ,over a prepaired sub base withh 43 grade cement or any other type as per clouse 1501 .2.2. M-30 grade corse and fine aggregates confirming to IS:383 maximum size of coarse aggregates not exeding 25 mm mixed in a concrete mixer of not less than 0.2 cum. capacity and apropreate weigh batcher using approoved mix design laid in a approoved fixed site form work (steel chanel ) laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the form work as per drawing ,speading the concrete with shovels rackes, compacted using needle screed and plate vibrators and finished in continuous oparation including provision of contraction and expansion ,construction jointes, applying debonding strips, primer,sealant dowel bars ,near aproches to bridge /culvert and construction joints admixtures as approoved curing of concrete slab for 14 days.using curing compounds(where specified ) and water finishing to lines and grade as per drawing and technical specification clause 1501. |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.5 |
| 8 | Reinforced cement concrete work in walls ( any thickness) including attached pillasters,buttresses ,plinth and strig courses,fillets coulumns,pillars ,piers,abutements,postsand struts etc up to plinth level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). as per SI No. 5.1.2 |
| 9 | Steel reinforcement for R.C.C. work ready to use \"cut and bend\" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 .6 ( Rates in BOQ are exclusive of G.S.T. Amount ) Please Enable Macros to View BoQ information |