|
| 1 | fo|qr forj.k [k.M ferkSyh ds dk;Z{ks= esa vka/kh rwQku o fofHkUu dkj.kksa ls iksy@ykbu {kfrxzLr gksrs jgrs gS] ftlls fo|qr vkiwfrZ ckf/kr gks tkrh gS] ftls rRdky lgh djk;s tkus dk dk;ZA |
| 2 | Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM) |
| 3 | Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM). |
| 4 | Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc. |
| 5 | Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. |
| 6 | Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I. |
| 7 | Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator. |
| 8 | Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator. |
| 9 | Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department. |
| 10 | Regrouting of Damage Stay (for STP Pole) |
| 11 | Regrouting of Damage Stay (for PCC Pole) |
| 12 | Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor. |
| 13 | Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor. |
| 14 | Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators. |
| 15 | Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators. |
| 16 | Cutting of tree branches near 33 KV line to avoid tripping. |
| 17 | Cutting of tree branches near 11 KV line to avoid tripping. |
| 18 | Repair/Replacement of burned jumper on sectional poles. |
| 19 | Repair of Damaged guarding of 33 KV line. |
| 20 | Repair of Damaged guarding of 11 KV line. Please Enable Macros to View BoQ information |