Phase I road wetting 0.25km west from Phase I Tea Stall area to 0.25km east from Phase I Yard Weigh Bridge, three times a day,each should last,atleast for 30 minutes so that the entire road portion is wet. Required Mini truck with driver shall be brought by the Contractor. Required Raw Water for wetting the road shall be provided by FACT,which shall be noted by the specific department.
3
Thorough washing of KEIL entrance new gypsum road to Phase I Yard Weigh Bridge area and any other specified road with water using 10000L trucks to the trenches available nearby and cleaning/clearing of the trenches.Road should of be clean after the work.
4
Removal of spillage gypsum on the new gypsum road,or any other area along the gypsum transportation from phase I weighbridge to Phase II using showel,wheel-barrow to gypsum yard phase I
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.