| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Demolishing cement concretemanually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Earth work in rough excavation, bankingexcavated earth in layers notexceeding20 cm in depth,breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :All kinds of soil |
| 4 | Brick work with Ist class common burnt clay F.P.S. (non modular) bricksin foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | Half brick masonrywith Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: Cement mortar 1 : 4 (1 cement : 4coarse sand) |
| 6 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement: 3 fine sand): Raised and cut pointing. |
| 7 | Granular Sub-Base with Close Graded Material (Table:- 400-1). By Mix in Place Method.Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-I Material. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level: |
| 10 | 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 11 | 1:5:10 ( 1 Cement: 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 12 | Steel work in built up tubular(round, square or rectangular tubes etc.) trusses etc., including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, including welding and bolted including special shaped washers etc. complete. Hot finished welded type tubes |
| 13 | Brick on edge flooring with bricks of Ist class on a bed of 12mm cement mortar including filling the joints with the same mortar with common burnt clay non modular bricks:1:4 (1 cement: 4 coarse sand) |
| 14 | Finishing walls with textured exterior paint of required shade :New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including base coat of water proofing cement paint applied @ 2.20kg/10 sqm. |
| 15 | Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 meter high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 meter center to center with 0.40 meter embedded in M 15 grade cement concrete, corner, end and every I 0th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.) |
| 16 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture. |