| 1 | Earthwork excavation and depositing on bank with an initial lead of 10 m and lift of 2m in Hard stiff clay blcak cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B as directed by TWAD Board officers. |
| 2 | Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc. complete as directed by TWAD Board officers |
| 3 | Supplying and filling of conveyed earth etc. complete as directed by TWAD Board officers |
| 4 | Cement concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing concrete, ramming, curing etc. complete as directed by TWAD Board officers (Beyond 1.50 m to 4.50 m) |
| 5 | RCC M30 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete as directed by TWAD Board officers |
| 6 | For items 1.5m to 4.5m below GL |
| 7 | 0 to 1.5m below GL |
| 8 | Above GL & Upto 4.5m |
| 9 | Above 4.51m & upto 7.32m from GL |
| 10 | Above 7.32m & upto 10.98m from GL |
| 11 | Above 10.98m & upto 14.64m from GL |
| 12 | Above 14.64m & upto 18.30m from GL |
| 13 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers. |
| 14 | Plane Surface |
| 15 | Below G.L. items |
| 16 | 0-3.30m Below G.L. |
| 17 | 5.30 m to 6.30mabove G.L. |
| 18 | 8.30 m to 9.30mabove G.L. |
| 19 | 11.30 m to 12.30mabove G.L.(Plane) |
| 20 | Curved surface |
| 21 | 0 to 3.30m |
| 22 | 3.30 to 4.30m |
| 23 | Square columns |
| 24 | Below GL |
| 25 | 0 to 3.30m above G.L. |
| 26 | 3.31 to 4.30m above G.L. |
| 27 | 4.31 to 5.30m above G.L. |
| 28 | 5.31 to 6.30m above G.L. |
| 29 | 6.31 to 7.30m above G.L. |
| 30 | 7.31 to 8.30m above G.L. |
| 31 | 8.31 to 9.30m above G.L. |
| 32 | 9.31 to 10.30m above G.L. |
| 33 | 10.31 to11.30m above G.L. |
| 34 | 15.24to 15.40 m above GL |
| 35 | Painting two coats with approved cement paint over the cement plastered surface. |
| 36 | Supplying fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc. complete and as directed by TWAD Board officers. |
| 37 | Fabrication, supply, delivery and fixing of outside MS ladder for 60000 lit with 12m staging height service reservoir (As per annexure)with one coat of redoxide paint, loading, transit, unloading, insurance charges, taxes etc., complete and as directed by TWAD Board officers. |
| 38 | Provision for EPL |
| 39 | Earth work excavating and depositing on bank with initial lead of 10 metre and initial lift of 2 metre in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification |
| 40 | Cost and supply of 90 mm PVC pipes 6kg/cm2 including all Charges etc..,Completed |
| 41 | Labour charges for Laying and jointing of 90 mm pvc pips with specials Including all Charges etc.,Completed |
| 42 | Refilling the pipe line trenches with excavted earth after the pipes are laid including all charges etc.,Completed |
| 43 | Provision for Name Board Charges |
| 44 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |