|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as perdirection of Engineer-in-charge |
| 2 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominalsize) |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treatedbars of grade Fe-500D or more. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers. |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access Platform. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, pillars, piers, abutments, posts and struts. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 9 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 10 | Brick work with common burnt clay (non-modular) bricks of classdesignation 7.5 in foundation and plinth including curing inCement mortar 1:4 ( 1 cement : 4 coarse sand) |
| 11 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor V level |
| 12 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steeletc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 13 | Removal of Excavated mulba dismantled unserviceable material from the site of work by mech. Transport / Animal Transport or otherwise including loading complete job. |
| 14 | Providing and fixing of inauguration Plate complete job as per direction engineer-in charge. |
| 15 | Providing and fixing of electric points including all fitting/wires (Complete Job) |
| 16 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using M.S. angles 40x40 |
| 17 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in- charge: in Cement mortar. |
| 18 | 15mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) |
| 19 | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 coarse sand) |
| 20 | 6 mm Cement plaster of mix: 1 : 3( 1 cement : 3 fine sand) |
| 21 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 25mm thick with 12.5 mm nominal size stone aggregate. |
| 22 | Carriage of materials by mechanical transport including loading / unloading & stacking complete.• Stone aggregate below/above 40mm Nominal sizeCrushed for an average distance of 10 kms. |
| 23 | Carriage of materials by mechanical transport including loading / unloading & stacking complete.• Bricks Please Enable Macros to View BoQ information |