| 1 | Painting of Bhasneh Filter plant Gursarai Jhansi |
| 2 | Scraping of old white or colour wash including disposal of refuse material as directed by engineer incharge with with a distance of 60 meter |
| 3 | Providing and applying plaster of paris putty of 2 mm thickness over plaster surface to prepare the surfaceeven and smooth complete. |
| 4 | One priming coat and two coat of appex paint including supply of all material T&P all complete work labour |
| 5 | Painting & varnishing on Iron work in small area with two coat of ready mixed priming paint & two coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all material labour T&P all complete etc. |
| 6 | Removing painting and varnishing on Iron work remover caustic soda including supply of all material T&P all complete work |
| 7 | Cement concrete flooring 1:2:4 aggregate of size 20 mm nominal laid in one layer finished with floatingcost of neat cement |
| 8 | providing and laying of ferrow cement concrete in 1:2:4 cement approved coarse sand and 20 mm guage approved stone ballast and mixing water proffing compound @ 1 kg/bag of cement in thickness of 5 cm average including making proper drainage with all labour T&P for completion of work. |
| 9 | Repairing of old window and doors includingmaterial all labour T&P for proper completion of work. |
| 10 | Rehabilitation of Old water Treatment Plant (WTP) of 4.5 MLD Capacity at Bhasneh Filter Plant Gursarai. |
| 11 | Temporary arrangement for cleaning of settling Tank Inclusive all labour & T&P complete by Ball, Bamboo Rassi etc. |
| 12 | Dewatering of Tank for cleaning of settling Tank inclusive deisel pump & operation with all labour T&P all complete work. |
| 13 | Cleaning of settling Tank Mud & muddy water with all material, labour T&P complete V=1/2(b1+b2)xHxLx0.7. |
| 14 | Apex painting of all Settling Tank in three coats including supply of all materials, labour T&Ps etc required for proper completion of work. |
| 15 | Removal of old Filter Media with all material labour and T&Ps complete. |
| 16 | Removal of Grevel with all material labour and T&Ps complete. |
| 17 | Cleaning & Filling of old Grevel with all material labour and T&Ps Direction of Engineer complete. |
| 18 | Apex Painting of all Filter bed in three coats including supply pf all material, labour T&Ps etc required for proper completion of work. |
| 19 | Cleaning of all water channels with brush anf with all labour and T&Ps complete. |
| 20 | Supply & Laying of additional Filter media (sandEffective size 0.45 to 0.70mm & uniformity coefficient 1.3 to 1.7) required for proper thickness fo filter bed as per confirming to relevant I.S 8419-1977 in filter Beds including freight, loading unloading insurence duties all complete. |
| 21 | Laying of 80mm interlocking concrete block & other work at Bhasneh Filter Plant Gursarai. |
| 22 | Supply and fixing wooden board for fixing starter and 1fixing cable properly etc with all labour T&P for completion of work. |
| 23 | Making of proper water drainage channel in campus and outer side of campus with all labour T&P for completion of work. |
| 24 | Supply of decorative plant/grass and planting them in Bhasneh campus for maing Garden with all labour T&P for completion of work |
| 25 | Supply and fixing of jal sansthan board at Gate and other work. |
| 26 | supply and fixing street light in campus including cable connection, fitting etc with all labout T&P for completion of work. |
| 27 | supply and fixing tube in Filter plant including cable connection, fitting etc with all labout T&P for completion of work. |
| 28 | Supply of 6 mm Gl roofing sheet for covering openC.W.R including carting T&P with all labour for completion of labour. |
| 29 | Supply of angle nut bolt etc for fixing sheet for covering C. W.R including carting T&P with all labour for completion of labour. |
| 30 | Carting sheet, angle,nut bolt etc from shop to site including loading unloading with all labour T&P for completion of work. |
| 31 | Covering the open C. W.R with GI sheet and angle including cutting, welding etc with aal labour T&P for completion of work. |
| 32 | construction of Boundary wall of brick work and R.C.C framed structure as per drawing and analysis with all labour T&P for completion of work. |
| 33 | providing and laying of 80mm interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. joint filled after labling and dressing base including supply of all material, labour T&P etc required for proper completion of the work. Please Enable Macros to View BoQ information |