|
| 1 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. |
| 2 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30@ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. |
| 3 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. |
| 4 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30@ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. |
| 6 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. Please Enable Macros to View BoQ information |