| 1 | Earth work in all kind of soil within 50m initiaol lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers no exceeding 0.3m in depth and as per direction of the Engineer-in -charge. |
| 2 | Transporting the earth by Mechanical means within 5.00 Km lead , lift including loading & unloading etc all complete. |
| 3 | Filling in foundation and plinth with sand watered and rammed including cost, lead & royality of sand etc complete to work site for 100 cum. |
| 4 | Cement Concrete in (1:4:8) with 40mm size HG Hand Broken Metal including all cost materials labour,convyance , royality tools ans plants water for curing etc. all complete as per O.P.W.D. specification required for the work to finished items of work. |
| 5 | Cement Concrete in (1:1.5:3) with 12mm size crusher Broken hard granite chips including hosting ans laying all cost of materials labour,convyance , royality tools ans plants water for curing etc. all complete as per O.P.W.D. specification required for the work to finished items of work. |
| 6 | Cutting , bending , binding of MS rod in placing in position including cost of binding wire. |
| 7 | Rigid ans smooth centering ans shuttering for RCC works including false works ans dismantling them agter casting including costof materials complete in ground floor. |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per clause 406 of MoSRT&H Specification for Road and Bridge works (4th revision) |
| 9 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MoSRT&H Specification for Road and Bridge works (4th revision) |
| 10 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.as per clause 502 of MoSRT&H Specification for Road and Bridge works (4th revision) |
| 11 | Providing laying Bitumins Macadom with hot mix plant using crushed agreegate of specified grading primixed with bituminous binder 60/70 penetration grade of bitumin,transporting the site,laid over a previously prepaired surface with a hydrostatic paver finisher with sensor control to the required grad ,level a ligament and rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per ctause 508 of MORT&H Specification for road & bridges works (4th rivision including cost and conveyance of materials T&P etc complete.Grading II using (19mm Normal Size) |
| 12 | Providing and laying Semi Dense Bituminous Concrete using crushed aggregate of grading-2 materials premixed with bitumenous binder@ 4.50 to 5.00%of mix and filler, transport the hot mix to work site, laying with a hydroststic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MoRT&H Clause No. 508 of MoSRT&H specifications for Road & Bridge works (4th Revision) Please Enable Macros to View BoQ information |