|
| 1 | Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 2 | Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 3 | Dismantaling old plaster or skirting ranking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead, etc. complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 4 | Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 5 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 6 | Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 7 | Plastering cover 50mm thick with using 20m stone jelly concrete in 1:2:4, over the C.R Stone Masonry dwarf wall with post, consolidating, curing, etc.complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 8 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) |
| 9 | Painting with two coats of enamel paint over primed surface, including cost of materials and labour, complete, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 10 | Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand Zone-III : 4 graded stone aggregate 20 mm nominal size), excluding centering and shuttering, for all works up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 11 | Location: Quarters 1 to 8. (Block 1 to 4) |