|
| 1 | Earthwork in excavation in soil mixed with mooram, shingle etc including 1.5metre lift and 30metre lead etc. |
| 2 | P/L of Cement Concrete 1:4:8(1 cement, 4 fine sand, 8 brick ballast 40mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. |
| 3 | First class B/W in 1:4 cement & fine sand including supply of all material, labour and T & P required for proper completion of work in foundation. |
| 4 | M150 Class brick work in superstructure in 9\" wall in 1:4 cement and fine sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete |
| 5 | M150 Class brick work in superstructure in 4\" wall in 1:4 cement and coarse sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete |
| 6 | 12mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand including supply of all material, labour and T & P etc. required for proper completion of work and curing complete |
| 7 | S/F of verified tile at floor & walls |
| 8 | P/L of Cement Concrete 1:2:4(1 cement, 2 fine sand, 4 graded stone ballast 20mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. |
| 9 | Reinforced Cement Concrete slab work in 1:1.5:3(1 cement, 1.5 coarse sand, 3 approved stone grit 20mm gauge) excludind supply of reinforcement and its binding but including its fixing and binding the same with 24 gauge wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T & P etc. required for proper completion of work and curing complete finished to required templete as directed by Engineer-in-incharge. Binding wire cost being included in the item. |
| 10 | Reinforced Cement Concrete Lintel beam work in 1:1.5:3(1 cement, 1.5 coarse sand, 3 approved stone grit 20mm gauge) excludind supply of reinforcement and its binding but including its fixing and binding the same with 24 gauge wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T & P etc. required for proper completion of work and curing complete finished to required templete as directed by Engineer-in-incharge. Binding wire cost being included in the item. |
| 11 | Mild steel bar for RCC |
| 12 | Flat back or angular front lipped urinal basin of white glazed earthenware 465X355X265mm Jaguar, cera or hindware etc |
| 13 | S/F of CPVC Pipe 100 mm dia drain pipe etc. |
| 14 | S/F of GI Pipe 20 mm dia etc. |
| 15 | S/F of GI Elbow 20 mm dia etc. |
| 16 | S/F of GI socket 20 mm dia etc. |
| 17 | Supply of Water Tank, 1000 Lt three layered White colour. |
| 18 | S/F of CP stop cock heavy quality |
| 19 | Labour work in sanitary fittings Please Enable Macros to View BoQ information |