|
| 1 | Dismantling of old and damage C.C. road including stacking of materials.[SI.No.694] |
| 2 | Earth work in Excavation in Ordinary Soil.(SI. No. 251) |
| 3 | Laying base concrete in 1:6:12 c/fs/bb mortar. [SI.No.273] |
| 4 | M&150 class Brick work in 1:3 mortar 1cement and 3 coars sand complete all work. [SI.No.307] |
| 5 | 12mm thick Plaster in 1:4 c/cs Mortar. (SI.No.584a) |
| 6 | RCC work in 1:1.5:4 c/cs/sg mortar (column) [SI. No. 289] |
| 7 | RCC work in 1:2:4 c/cs/sg mortar (Beam) [SI. No. 285] |
| 8 | MS work in RCC Work all work complete with T&P |
| 9 | Earth work in Filling With Ordinary Soil including Cartage upto 8 Kms (SI No. 253+261+231a) |
| 10 | Providing and Fixing MS Iron gate and Grill of Mild Steel Tee-Sections, Squar bars, Joints mitred and welded, including fixing of necessary |
| 11 | Supply and Layning of 80mm Thick Interlocking Tiles Complete Work All Complete With T&P etc. (SI. No. 1, New Item 14, Ch. No. 20) |
| 12 | Disposal of surplus dismantled material up to 2 kms. [SI.No.231a] |
| 13 | Providing wall Putty on New Surface. (Ch.No.15.SI. No.15.22) |
| 14 | Finishing wall with water proof cement paint. (SI. No.660+661) |
| 15 | Painting work(SI. No. 642+643) |
| 16 | Electric Fitting as per necessary of Site. |
| 17 | Cleaning/uprooting/grassing/dressing manuring of Soil. |
| 18 | Grass rooting all work complete. |
| 19 | Child Friendly equipments all work complete. |
| 20 | Supply and Fixing of park benches all work complete. |
| 21 | Plantation and horticulture all work complete. (Bogen Beliya) |
| 22 | Plantation and horticulture all work complete. (Faicus) |
| 23 | Plantation and horticulture all work complete. (Saycus) |
| 24 | Plantation and horticulture all work complete. (Unifress) |
| 25 | Plantation and horticulture all work complete. (Labour Charge) |
| 26 | Supply and Fixing of LED Decorative Bollard Light all Complete. |
| 27 | Supply and Fixing of 1.5 mm wire all work complete. |
| 28 | Supply and Fixing of Main Switch with box all work complete. |
| 29 | S/F of marble stone sign board at site. |
| 30 | Cleaning of site during work, Dismantling ramps, Photo of site. Please Enable Macros to View BoQ information |