| 1 | PART-AS/O ST Pole 11 Mtr. Long IS : 410 SP 55 |
| 2 | S/O PCC Pole 8.5 Mtr |
| 3 | S/O ACSR WEASLE conductor |
| 4 | S/O 11 KV ploymetric Pin insulator with nut |
| 5 | S/O 11 KV polymetric Disc Insulator 70KN |
| 6 | S/O 11 KV Disc fitting 70KN |
| 7 | S/O Stay set complete 16x1800mm |
| 8 | S/O Stay wire (4mm) 7/8 SWG (GS Wire) |
| 9 | S/O V Type X Arm 11 KV 65x65x6mm |
| 10 | S/O F Bracket |
| 11 | S/O Clamp with Nut & Bolt |
| 12 | S/O Earthing complete |
| 13 | S/O G I wire 5 mm, 6 swg |
| 14 | Stone pad 300x300x75mm |
| 15 | Distribution Box 3 phase (LT) |
| 16 | 11 kv DO Fuse set |
| 17 | S/O M.S. T off channel |
| 18 | S/O Dropper Channel 100x50x6mm (2000mm) |
| 19 | S/O M.S. angle for transformer base 65x65x6mm bracing with 4 Nos. clamp |
| 20 | S/O Top Channel 100x50x6mm (2240mm) |
| 21 | S/O Concreating of pole |
| 22 | S/O Concreating of stay set |
| 23 | S/O Suspension clamp |
| 24 | S/O Dead End clamp with I hook |
| 25 | S/O I Hook |
| 26 | S/O J Hook |
| 27 | S/O Aluminium Paint |
| 28 | Red Oxide Primer |
| 29 | S/O AL Binding Wire |
| 30 | S/o LT ABC Cable ( 3x95+1x70+1x16) |
| 31 | Labour Charges :-Dismantling of Old Line/Material and deposit to store including cartageErection with T&PLaying, Testing & Commissioning etc@ 30% of S.No. 1 to 30 of BOQ |
| 32 | Shifting of D T/F to new DP & plinth |
| 33 | PART-BS/O ST Pole 11 Mtr. Long IS : 410 SP 55 |
| 34 | S/O D/P Structure with STP Annexure DP for 11KV |
| 35 | S/O PCC Pole 8.5 Mtr |
| 36 | S/O ACSR WEASLE conductor |
| 37 | S/O Cable AL 3X185 sqmm XLPE 11 KV |
| 38 | S/o G.I Pipe 6\" |
| 39 | S/O Cable Jointing Kit outdoor 11 KV 3C X 185 sqmm |
| 40 | S/O 11 KV ploymetric Pin insulator with nut |
| 41 | S/O 11 KV polymetric Disc Insulator 70KN |
| 42 | S/O 11 KV Disc fitting 70KN |
| 43 | S/O Stay set complete 16x1800mm |
| 44 | S/O Stay wire (4mm) 7/8 SWG (GS Wire) |
| 45 | S/O V Type X Arm 11 KV 65x65x6mm |
| 46 | S/o Guarding Angle |
| 47 | S/o Guarding Angle clamp |
| 48 | S/O F Bracket |
| 49 | S/O Earthing complete |
| 50 | S/O G I wire 5 mm, 6 swg |
| 51 | S/O Stone pad 300x300x75mm |
| 52 | S/O Distribution Box 3 phase (LT) |
| 53 | S/0 11 kv Fuse set |
| 54 | S/0 11 kv TPMO |
| 55 | S/O M.S. T off channel |
| 56 | S/O Dropper Channel 100x50x6mm (2000mm) |
| 57 | S/O M.S. angle for transformer base 65x65x6mm bracing with 4 Nos. clamp |
| 58 | S/O Top Channel 100x50x6mm (2240mm) |
| 59 | S/O Concreating of pole |
| 60 | S/O Concreating of stay set |
| 61 | S/O Clamp with Nut & Bolt |
| 62 | S/O Suspension clamp |
| 63 | S/O Dead End clamp with I hook |
| 64 | S/O I Hook |
| 65 | S/O J Hook |
| 66 | S/O Aluminium Paint |
| 67 | Red Oxide Primer |
| 68 | S/O AL Binding Wire |
| 69 | S/o LT ABC Cable ( 3x120+1x95+1x16) |
| 70 | Danger Board with clamp nut & bolt |
| 71 | S/o Barbed wire |
| 72 | Labour Charges :-Dismantling of Old Line/Material and deposit to store including cartageErection with T&PLaying, Testing & Commissioning etc@ 30% of S.No. 43 to 81 of BOQ |
| 73 | Shifting of D T/F to new DP & plinth |
| 74 | TREE branch cutting |
| 75 | PART-CS/O ST Pole 11 Mtr. Long IS : 410 SP 55 |
| 76 | S/O PCC Pole 8.5 Mtr |
| 77 | S/O ACSR WEASLE conductor |
| 78 | S/O 11 KV ploymetric Pin insulator with nut |
| 79 | S/O 11 KV polymetric Disc Insulator 70KN |
| 80 | S/O 11 KV Disc fitting 70KN |
| 81 | S/O Stay set complete 16x1800mm |
| 82 | S/O Stay with (4mm) 7/8 SWG (GS Wire) |
| 83 | S/O V Type X Arm 11 KV 65x65x6mm |
| 84 | F Bracket |
| 85 | S/O Earthing complete |
| 86 | S/O G I wire 5 mm, 6 swg |
| 87 | Stone pad 300x300x75mm |
| 88 | Distribution Box 3 phase (LT) |
| 89 | 11 kv Fuse set |
| 90 | S/O M.S. T off channel |
| 91 | S/O Dropper Channel 100x50x6mm (2000mm) |
| 92 | S/O M.S. angle for transformer base 65x65x6mm bracing with 4 Nos. clamp |
| 93 | S/O Top Channel 100x50x6mm (2240mm) |
| 94 | S/O Concreating of pole |
| 95 | S/O Concreating of stay set |
| 96 | S/O Clamp with Nut & Bolt |
| 97 | S/O Suspension clamp |
| 98 | S/O Dead End clamp with I hook |
| 99 | S/O I Hook |
| 100 | S/O J Hook |
| 101 | S/O Aluminium Paint |
| 102 | Red Oxide Primer |
| 103 | S/O AL Binding Wire |
| 104 | S/o LT ABC Cable ( 3x95+1x70+1x16) |
| 105 | Labour Charges :-Dismantling of Old Line/Material and deposit to store including cartageErection with T&PLaying, Testing & Commissioning etc@ 30% of S.No. 83 to 114 of BOQ |
| 106 | Shifting of D T/F to new DP & plinth Please Enable Macros to View BoQ information |