| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 50 mt.& including filling, watering and ramming of excavated earth . dsr 2.6.1 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.. 2.25(A) |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Dsr.2.27 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size.dsr 4.1.8 |
| 5 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per SI No- 6.1.1Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per SI No- 6.1.1 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). sunshade SLAB ,DSR 5.3 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22.6 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Linels, Beams, Plinth Beam, Girder etc. DSR-5.9.21 |
| 9 | 15 mm thick cement plaster of mix 1:6 ( 1 cement & 6 course sand ) Plinth Plaster as per IS 13.5.2 |
| 10 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing omplete. As SI No-11.27 |
| 11 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes. As per SI no. 10.16.3 |
| 12 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (b) 0.80 mm thick with zinc coating not less than 275 gm/m². As per SI-12.1.2 |
| 13 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.l. limpet and bitumen washers complete.(a)0.80 mm thick with zinc coating not less than 275 gm/m². As per SI-12.4.1 |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture as per Sl no. -13.62.1 |
| 15 | Water cooler 150 Liter storage full stainless steel low power Eco Friendly. as per market rate.Including all materials, labours, T&P etc required for proper completion of work |
| 16 | Supply and Fixing of Sign Board/Caution Board showing information about site etc. Includind supply of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer in charge. Please Enable Macros to View BoQ information |