Name of Work:- शहाबुद्दीन पुर गांव में गौरव के मकान से संतोष के मकान तक सीसी रोड का निर्माण कार्यa
Sl. No.
Item Description
1
P/F murga jali 1\"/3\" x 10 gauge. New item of chapter-1.(180 - 5% = 171.00)
2
Concrete with 4cm. gauge brick ballast, coarse sand of 2.20 F.M and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of the work.(SI.No.281/2022) As per G.O. rate (4850 - 5% = 4607.50)
3
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavment (thickness as per design) cement coarse & fine aggregate confirming to IS standred mixed in concrete mixer/plant of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed from work(steel channel) laying & fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work spreding the concrete with shovles. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavments for not less then 14 days, curing compound (Where specified) and water finishing to lines and grade includings supply of all materials, labour Tools &plants etc. required for proper completion of work and also includin complete shifting of Recron 38 fibre reinforcement materials etcl & concrete etc S.I. No. New Item 9/2022,As per G.O. rate (7300 - 5% = 6935)
4
M-150 brick work in 1:4 cement and coarse sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all material, labour T&P etc. required for proper completion of the work as per direction of the work as per direction of Engineer-in-charge.(SI.No.305a/2022) As per G.O. (4690 - 5% = 4455.50)
5
12mm thick cement plaster with 1:4 cement and fine sand of 1.25 FM mortar over brick work minimum thickness not to be less than 1cm including supply of all material, labour, tools and plants etc, required for proper completion of the work as per direction of Engineer-in-charge.(SI.No.584/2022) As per G.O. (160 - 5% = 152.00) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.