Name of Work:- Tksu&3 Rktxat D{K La[;K&57 Ds M[Kjkz Flfkr Efunj Okyk Pksd ,Oa Ijpwu Dh Nqdku Ls Ysdj Vªkalqkezj Rd Lh-Lh- }Kjk Qkz Fuekz.K Dk;Za
Sl. No.
Item Description
1
Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.)
2
Class-150 brick work in 1:4 cement and coarse sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapte No. 06 S.I. No. 2)
3
Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.Si.-01)
4
12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 cement : 4 Coarse sand.(Chapter No. 13 S.I. No.-582(ii))PWD Shedule
5
Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-150 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter SI.No.279(a))PWD Shedule
6
Supply & Fixing 3.5Kg and or as specified by the manufacture, harderner in trexim concrete per sqm.
7
R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.cc Slab supply of reinforcement and its bending butinculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter S.I. No.-284) PWD Sheduled
8
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B))
9
Supply & Fixing Granite Board 2.5\"x4\" Size Display Board including Painting, Lettering etc. all complete. (None Schedule)
10
Sub Total (A)
11
Add/Deduction Rs. For Estimate Figure Amount Match
12
Grand Total Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.