E/w in excavation in foundation in ordinary soil including lead up to 30.00 m and lift 1.50m and all labour material and T&P etc. as per SI. No. 251
2
Cement concrete with 1:6:12 in 40 mm guage brick ballast, fine sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under C.C. including supply of all material , labour and T&P etc required for proper completion of word as per SI. No. 273.
3
M-150 class brick work in 1:6 cement & coarse sand mortar in foundation up to plinth as per SI. No.
4
M-150 class brick work in 1:4 cement & coarse sand mortar in Super stucture as per SI. No.
5
R.C.C. work in 1:2:4 ratio of cement & coarse sand and 20 mm guage stone grit for piller column including all complete SI. 283
6
12 mm thick plaster in 1:4 cement and coarse sand i/c all alabour and material T&P etc complete.
7
M.S. Iron work in R.C.C. i/c all completer for Beam
8
Providing and laying vetrified tiles in floor without leam concrete of 600mmx600mm size (thickness 10mm ) with water absorption less than 0.08% and confiming i/c all complete Si.No 11.41A Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.