|
| 1 | Surface dressing of the ground including removal of vegetation and inequalities not exceeding 15 cm in depth and disposal of rubbish with lead up to 50 m and lift up to 1.5 m, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 2 | Site clearance including careful removal of damaged barbed wire fencing with broken L-angle posts, stacking serviceable materials in one place and conveying debris to the designated dumping yard, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 3 | Excavation work by mechanical or manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides, ramming of bottoms, lift up to 1.5 m, disposal of surplus soil within 50 m lead, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 4 | Supplying and filling sand in foundation/basement in layers not exceeding 15 cm thickness, well watered, rammed and consolidated, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 5 | Cement Concrete 1:4:8 (1 cement : 4 sand : 8 hard broken stone jelly) using 40 mm gauge granite stone jelly for foundation, including dewatering wherever necessary, laid in layers not exceeding 15 cm thickness, well rammed, consolidated and cured, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge |
| 6 | Random Rubble Masonry with hard stone in foundation and plinth, including levelling up with cement concrete 1:6:12 up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 7 | Coursed Rubble Masonry (First Sort) with hard stone in foundation and plinth, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 8 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand), complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 9 | Providing and laying 50 mm thick coping using 1:2:4 concrete over CR stone masonry dwarf wall with posts, including consolidation, curing and 20 mm thick cement plaster in 1:4 mix on top surface, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 10 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.(for Grills) |
| 11 | Fabrication, supply and fixing of structural steel work welded in built-up sections including cutting, hoisting, fixing in position and applying one coat of approved steel primer in gratings, frames, guard bars, ladders, railings, brackets, gates and similar works, complete as per standard specifications and as directed by the departmental officers, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge.)(For Gate) |
| 12 | Painting with two coats of enamel paint over primed surface, including cost of materials and labour, complete, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 13 | Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand Zone-III : 4 graded stone aggregate 20 mm nominal size), excluding centering and shuttering, for all works up to plinth level, complete as per standard specifications, including cost of all materials, conveyance, loading and unloading, labour, hire charges, fuel, tools and plant, all applicable taxes, and incidental charges, complete as directed by the Engineer-in-Charge. |
| 14 | Location: Quarters 1 to 8. (Block 1 to 4) |