| 1 | Supply of Distribution board - VI shall be comprising with suitable way of 1 No 63 A, 4P, MCB as incomer and 5 Nos 20A, SP, MCB 5 Nos 10A, SP, MCB as outgoing circuits with suitable copper wires/bus bars for each phase and neutral along with all other components and accessories |
| 2 | Installation of aboveDB as per Schedule ‘A’. |
| 3 | Supply of 4 Feet 2 X 20w Box type LED Fittings with T8 LED Tube light with all connections other accessories as per Schedule ‘A |
| 4 | Installation of 4 Feet Tube Light Fittings as per Schedule ‘A’. |
| 5 | Supply of 4 Feet 1 X 20w Box type LED Fittings with T8 LED Tube light with all connections other accessories as per Schedule ‘A |
| 6 | Installation of 4 Feet Tube Light Fittings as per Schedule ‘A’. |
| 7 | Supply and Install / Replacing to be mount in the Surface/ Recessed switchboard of all materials of 5 Amps modular switch including supply of modular switch boxwith all other accessories to control of fan, light etc., as per Schedule ‘A. |
| 8 | Supply of switch board and all materials and accessories for 16A/15A MODULAR type switch and 15A/5A socket outlet along with base plates, FRAME AND with SUITABLE BOX connections as per Schedule ‘A’ |
| 9 | Install / Replace Surface/ Recessed of all materials and accessories for 16A/15A MODULAR type switch and 15A/5A socket outlet along with base plates, FRAME AND with SUITABLE BOX connections as per Schedule ‘A’ |
| 10 | Supply of switch board and all materials and accessories for 2 Nos 5A MODULAR type switch and socket outlet along with base plates, FRAME AND with SUITABLE BOX connections as per Schedule ‘A’ |
| 11 | Install / Replace Surface/ Recessed of all materials and accessories for 2 Nos 5A MODULAR type switch and socket outlet along with base plates, FRAME AND with SUITABLE BOX connections as per Schedule ‘A’ |
| 12 | Supply of switch board and all materials of 5 Amps Modular Switch and Socket outlet to be mounted in the modular type Sub Switch Board itself, including base plates, FRAME and wiring to the plug as per Schedule ‘A’ |
| 13 | Install / Replacing to be mount in the Surface/ Recessed switch board of all materials of 5 Amps Modular Switch and Socket outlet to be mounted in the modular type Sub Switch Board itself, including base plates, FRAME and wiring to the plug as per Schedule ‘A’ |
| 14 | Supply of 1200 MM, brown colour sweep Ceiling fan, with wide blades, suitable down Rod, electronic regulator and all other accessories |
| 15 | Installation of Ceiling fan as per Schedule ‘ A’ |
| 16 | Supply of 450 mm sweep, Wall mounting fan with polypropylene plastic blade, powder coated metal body and guards with speed control and all other accessories as per Schedule ‘A’. |
| 17 | Installation of above Wall mounting fans as per Schedule ‘A’. |
| 18 | Supply of 12” size of Exhaust fan with necessary clamps and accessories for all units as per the technical specifications as per Schedule ‘A’. |
| 19 | Installation of above Exhaust fan as per Schedule ‘A’. |
| 20 | Supply of 15 litre, 2000 Watts storage water heater with ABS body and PUF insulation as per Schedule ‘A’. |
| 21 | Installation of above Heater as per Schedule ‘A’. |
| 22 | Supply and wiring of all materials and accessories to carry out the surface/concealed wiring by using suitable size of PVC conduit /Casing and capping with 3 runs 1.5 Sq.mm FRLS PVC insulated unsheathed multistrand copper conductor multistrand wires for Phase, Neutral and Earth. From SSB to Individual PT for Fans, Tube lights etc., through connected junction/ inspection boxes along with modular flush type control switch along with base plates and ceiling rose including terminations wherever necessary as per the technical specifications as per Schedule ‘A’ The Contractor shallcut the groove on the wall as per the requirement, after laying the pipe & wire, the same area shall be replaster the groove. |
| 23 | Supply one number 16A/20A DP, MCB with suitable connections andmetal type Enclosure (C series MCB) as at various locations as per Schedule ‘A’. |
| 24 | Install of one number 16A/20A DP, MCB with suitable connections andmetal type Enclosure (C series MCB) as at various locations as per Schedule ‘A’. |
| 25 | Supply and Wiring of all materials and accessories and to carry out the surface/concealed with suitable size of PVC conduit /CASING and Capping wiring by using with 2 runs 4 sq.mm and one run of 2.5 Sq.mm FRLS PVC insulated unsheathed multistrand copper conductor wires etc., through connected junction/ inspection boxes along with terminations wherever necessary as per Schedule ‘A. The Contractor shallcut the groove on the wall as per the requirement, after laying the pipe & wire, the same area shall be replaster the groove. |
| 26 | Supply and Wiring of all materials and accessories and to carry out the surface/concealed with suitable size of PVC conduit /CASING and Capping wiring by using with 2 runs 2.5 sq.mm and one run of 1.5 Sq.mm FRLS PVC insulated unsheathed multistrand copper conductor wires etc., through connected junction/ inspection boxes along with terminations wherever necessary as per Schedule ‘A. The Contractor shallcut the groove on the wall as per the requirement, after laying the pipe & wire, the same area shall be replaster the groove. |
| 27 | Supply and Wiring of all materials and accessories and to carry out the surface/concealed with suitable size of PVC conduit /CASING and Capping wiring by using with 3 runs 1.5 sq.mm FRLS PVC insulated unsheathed multistrand copper conductor wires etc., through connected junction/ inspection boxes along with terminations wherever necessary as per Schedule ‘A. The Contractor shallcut the groove on the wall as per the requirement, after laying the pipe & wire, the same area shall be replaster the groove. |
| 28 | Supply of 4 core 25 Sq.mm L.T. underground cable of 1100 V galvanized steel strip armoured XLPE cable with stranded Aluminium conductorconforming to IS 7098 Part I 1985 with latest amendments with ISI mark for various locations. |
| 29 | Laying of the cable of on the wall by Alu. Clamping with equal intervals with all other accessories |
| 30 | Laying of the cable of through Excavation of Earth is not less than 60 cm. width x 60 cm. depth to lay with RCC Trough and re-close the same and make the surface as original |
| 31 | Supply of all materials for 2 Mtr length, 25 mm dia Maintenance free earthing at various locations as per schedule ‘A’ |
| 32 | Installation of above maintenance free earthing as per Schedule ‘A’ |