| Sl. No. | Item Description |
| 1 | Excavation in dense or hard soil/murrum, and different type of strata, etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. |
| 2 | Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All tools, labour & material etc. complete. |
| 3 | Dismantling steel work in trusses etc. with angles, tees, flats,plates, gussets plates, pulleys, anchor bolts, nuts, washer, etc. including bringing down using derrick, gas cuting / dismembering and stacking within a lead of 100m including all tools & plant, labour and material complete. |
| 4 | Supplying & erecting in position structural steel work in single section incl. cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of redoxide zincchromite primer etc. All labour & materials tools & plant etc. complete. |
| 5 | Constructing masonry in foundation and plinth using precast cement concrete solid blocks of approx size 30 x 20x 15, having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing, dismantling/removing loose/ soft masonry etc. All tools, plants labour & material etc. complete. |
| 6 | Constructing masonry in superstructure using precast cement concrete solid blocks of approx size 30 x 20x 15, having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners,curing,scafolding, dismantling/ removing of loose/ soft masonry etc. All tools, plants labour & material etc. complete. |
| 7 | Constructing masonry in superstructure such as partition walls, parapets etc. 10 cm thick using precast cement concrete solid blocks having a crushing strength of not less than 35Kg./cm2 (28 days) and a mix not leaner than (1:5:10) in cement mortar (1:4) including providing specially moulded block at junctions and corners, providing 2 M.S. bars 6mm dia at every fourth course, all scaffolding, lifts, raking out joints, curing etc. All labour & material etc. complete. |
| 8 | Providing coping over compound wall etc. of cement concrete (1:2:4) mix using 20mm black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, side shuttering, consolidating, levelling, curing etc. All labour and material, tools & plant etc. complete. |
| 9 | Stripping old cement plastering and clearing away the same at places pointed out within a lead of 100m, cleaning the surfaces etc. As directed. All labour & material tools & plant complete. |
| 10 | Flush pointing with cement mortar (1:3) on laterite/concrete block masonry etc. incl. raking out joints, cleaning, scaffolding, curing etc. All labour & material complete. |
| 11 | Raised & cut pointing with cement mortar (1:3) on masonry etc. including raking out joints, cleaning, scaffolding, curing etc. All labour& material, tools & plant etc. complete. |
| 12 | Plastering/finishing with C.M. (1:3) 10mm thick (average) in single coat including raking out joints, hacking, cleaning and preparing the surface, curing, chamfers, beading, scaffolding, all leads, lifts making all bands, bays, fluting etc. All labour& material, tools & plant etc. complete. |
| 13 | Plastering with C.M. (1:3) 15mm thick in two coats to internal surfaces (Backing coat of 10mm & finishing coat of 5mm). All labour & material etc. complete |
| 14 | Plastering with C.M. (1:5) 15mm thick in two coats for external surfaces (Backing coat of 10mm & finishing coat of 5mm) including Patches, bays, bands, fluting, scaffolding and cleaning of all dirts, raking out joints, hacking, scrubbing, chamfers, beading, curing, all lifts etc. All labour & material complete |
| 15 | \"Extra over plastering item, for mixing water proofing compound in plastering with C.M. (1:5) 15mm thick\" |
| 16 | Providing and injecting grouting fo identified critical areas of cracks, honeycomb and other porous areas of terrace with polymermodified cement slurry using conplast wl ,Polyalk WP or equivalent in proportion of polymer, cement and water at the ratio of1:3:2 by weight and grouting shall be done usinghand grouting machine till refusal, curing the areaby spray etc. complete as directed with all labour ,tools, plants, equippments and materials . |
| 17 | Repairs of the internal and external cracks in plastered surfaces using crack filler of Dr. Fixit 202 Crack-X or equivalent make powder. ( Rate shall be based on the consumption of crack filler powder) |
| 18 | Providing finishing coat of lime punning or neeru with screened lime & white sand (1:1) 3mm thick incl. Curing, preparing the surfaces, scaffolding etc. All labour & material complete |
| 19 | Providing and laying Cement concrete (1:3:6) using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. all labour and material etc. complete. |
| 20 | Providing and layingCement concrete (1:2:4) using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. all labour and material etc. complete. |
| 21 | Providing and laying Cement concrete (1:1½:3) using 20mm graded black trap stone metal out of quarried boulders, as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. all labour & material etc. complete |
| 22 | Providing RCC (1:11/2:3) mix using 20mm graded black trap stone metal out of quarried boulders as coarse aggregate in columns, beams, lintels, etc. of any size and shape, including mixing, placing, consolidating, vibrating, levelling, curing etc. but excluding the cost of shuttering and reinforcement. All labour & material etc. complete. |
| 23 | Providing and fixing reinforcement with Torsteel conforming to IS:1786 or equivalent including cutting, bending, tying grills, placing in position, holding in position during concreting etc. including cost of binding wire. All labour & material etc. complete |
| 24 | Providing & fixing shuttering for beams, cantilever beams,etc. of any size and shape including cleaning, oiling, closing, gaps, removing shuttering after concreting, provisions of necessary props, bracings and other supports etc. All labour and material etc. complete |
| 25 | Providing water proofing to the roof slab, chajjas using \"Dr Fixit 310 PIDIcrete URP\" compound or equivalent mixed in cement in the ratio (1 :1.5) in 2 coats including preparing the surface etc. All tools, plants, labour, material etc. complete. |
| 26 | Providing and laying Micro concrete of FOSROC of 25kg bag including providing shuttering, cleaning the surface, watering, mixing and laying the concrete as directed by Chief Engineer/ Executive Engineer or his authorised representative etc. All tools, plants, materials, labour, etc. complete .( Note : Rate considered shall be as per 25kg bag supplied) |
| 27 | Painting iron work/metal work with a primer coat of Red Oxide Zinc Chromite including scrapping, cleaning, surfaces. All tools, plants, materials, labour, etc. complete |
| 28 | Painting iron work/metal work with two coats of approved synthetic enamel paint of approved colour/shades (excluding priming coat) including preparing the surfaces, as directed, etc.. All tools, plants, materials, labour, etc. complete |
| 29 | Painting iron/metal surfaces with two coats of Apcodur Micaceous iron oxide paint incl. Cleaning and preparing the surface necessary scaffolding/ladder etc. All labour and material complete. |
| 30 | Painting wood work with Asian paint wood primer. incl. Cleaning and preparing the surface.All labour and material complete. |
| 31 | Painting wood work with 2 coats of approved synthetic enamel paint on old surfacesof appproved shade/colour incl. Preparing & cleaning the surface but excluding priming coat. All labour and material complete. |
| 32 | \"Painting two coats on previously painted masonry/concrete/ plastered surfaces with synthetic enamel paint incl. Cleaning & preparing the surfaces.All labour and material complete.\" |
| 33 | White washing two coats on wall surface incl. Scaffolding, brooming the surfaces to remove all dirt, dust, mortar dropings etc. All labour & material complete. |
| 34 | Painting with distemper primer of approved quality (cement primer) incl. Cleaning & preparing the surface, scaffolding etc. All labour & material complete. |
| 35 | Distempering with oil bound distemper of approved quality/make and colour/shade in two coats incl. Cleaning and preparing surface, scaffolding etc. All labour & material complete. |
| 36 | Painting external surfaces of walls, roof top, bays, bands, chajjas, grooves with etc. with premium acrylic weatherproof exterior paint with silicone additives of approved quality/ make of standard approved brands, colour in two coats on existing old surfaces including scrubbing and cleaning the surface of all dirt, dust, crack filling , touch-up putty, curing, necessary, scaffolding, ladders etc. complete as directed. All tools, plants, labour and materials, etc. complete |
| 37 | Letter painting of any board and size with synthetic enamel paint the background as directed by the Chief Engineer All tools, plants, materials, labour & materials tools & plant etc. complete. |
| 38 | Providing and fixing ornamental grills of approved patternusing MS.flat ,square bars,etc.or any other sections including welding, cutting grinding,drilling holes,fixing with countersunk screws etc.All labour and materials etc. complete. |
| 39 | Supplying and fixing GI Chain Link Wire Mesh having mesh size 75x75mm of minimum Gauge 8 (4.10mm) and width 10 feet with Diamond hole shape to existing structural members, including welding, cutting, providing small M.S. fixtures for support. as directed by the Chief Engineer All tools, plants, materials, labour & materials tools & plant etc. complete. |
| 40 | Supplying and fixing GI Chain Link Wire Mesh having mesh size 75x75mm of minimum Gauge 8 (4.10mm) and width 4 feet with Diamond hole shape to the existing/new structural members, including welding, cutting, providing small M.S. fixtures for support. as directed by the Chief Engineer All tools, plants, materials, labour & materials tools & plant etc. complete. |
| 41 | Supplying and fixing Barbed Wire of Tata make including welding, cutting, providing small M.S. fixtures for support. All labour & materials tools & plant etc. complete. |
| 42 | \"Supplying and fixing concertina coil of 600mm dia to the existing/ new structures including welding, cutting, providing small M.S. fixtures for support. All labour & materials tools & plant etc. complete. (Note: The rate considered is based on the length of concertina fencing area covered over the compound wall.) |
| 43 | Drilling holes in the RCC surface upto 205mm depth including providing and fixing full threaded 25mm dia M.S. anchor bolts with nuts, washer, etc.,cleaning, grouting with anchor grout of Fosroc Lokfix P or equivalent into the holes, providing safefy equipments, scafolding, etc. . All labour & materials tools & plant etc. complete. |
| 44 | Drilling holes in the RCC surface upto 255mm depth including providing and fixing 32mm dia E.N.8 Eye hooks, cleaning, grouting with anchor grout of Fosroc Lokfix P or equivalent into the holes, providing safefy equipments, scafolding, etc. . All labour & materials tools & plant etc. complete. |
| 45 | Drilling holes in the RCC surface upto 155mm depth including providing and fixing 25mm dia E.N.8 Eye hooks, cleaning, grouting with anchor grout of Fosroc Lokfix P or equivalent into the holes, providing safefy equipments, scafolding, etc. . All labour & materials tools & plant etc. complete. |
| 46 | Drilling holes in the RCC surface upto 605mm depth at Truss level of sheds including providing and fixing full threaded 25mm dia M.S. anchor bolts with nuts, washer, etc. cleaning, grouting with anchor grout of Fosroc Lokfix P or equivalent compound into the holes including removing and refixing of roofing sheets, providing scafolding, chain pulley, supported on M.S. Stand for jacking truss, as directed. All labour & materials tools & plant etc. complete. |
| 47 | Drilling holes in the RCC surface upto 605mm depth at Truss level of sheds including providing and fixing full threaded 25mm dia M.S. anchor bolts with nuts, washer, etc. cleaning, grouting with anchor grout of Fosroc Lokfix P or equivalent compound into the holes including removing and refixing of roofing sheets, providing scafolding, chain pulley, supported on M.S. Stand for jacking truss, as directed. All labour & materials tools & plant etc. complete. |
| 48 | Dismantling and removing the damaged \" U\" bolt and fixing new \" U\" bolt , including core cutting of concrete wall for inserting the bolt of upto 40cm dept. in the concrete, grounting with anchor grout of Fosroc Lokfix Por equivalent, providing safefy equipments, scafolding, etc.. All tools, plant, labour and material etc. complete. ( Note : the rate does not include the cost of the \"U\" Bolt). |
| 49 | Removing the damaged Frontal frame with UHMWPE Pad including bolts and nuts with care and replacing with cell fender pad supplied by the Department, including transporting and stacking the damaged cell fender pad at MM stores Baina or as directed, fixing the cell fender Pad supplied by the Department, transporting from Breakwater/ mole to Berth No: 10,. All tools, plant, labour and material etc., complete. |
| 50 | Removing the damaged cell fenders set including bolts &nuts with care and replacing with cell fender set supplied by the department including transporting and stacking the damaged cell fenders cpad at MM stores ,Baina or as directed .All tools,plant, labour and materials etc. complete. |
| 51 | Repairs to the damaged hook of the cell fender pad including cutting the damaged hook and providing new M.S. hook for Fender pad, welding, providing new D- shackle of existing type at the hook portion, re-fixing the existing chain to the hook, . All tools, plant, labour and material etc. complete. |
| 52 | Making holes in truck tyres of up to 80mm dia using corecutting machinewith stand .etc. as directed . . All tools, plant, labour a material etc. complete. (Rate per hole) |
| 53 | Making holes in giant truck tyres of up to 110mm dia using corecutting machinewith stand .etc. as directed . . All tools, plant, labour and material etc. complete. (Rate per hole) |
| 54 | Supplying giant type fenders of JCB/Wheel loader/lorries etc.for fendersof jetty as and when requiredof approvedsize in good condition including cost of transporting to the site ,loading & unloading etc. All tools, plant, labour and material etc. complete. |
| 55 | Supplying of MS chain of size 20mm (3/4\") dia ER butt welde in good condition( for suspending and holding Giant tyre fenders in position in Marine berth area) as directed by Chief Engineer or his authorised representativeincluding transpoting and stacking as directed. All tools, plants, labour and materials etc. complete. |
| 56 | Shifting and suspending the tyre fenders available tyres (for Giant Tyres) in position with M.S. short link chain, both supplied by the department (contractor is required to collect tyres and m.s. chain from ( AXEN/MOHC Stores/ Near Gate No:9/MM Stores ) including making 3 holes in a tyres as directed, providing, fabricating, fixing 100mm dia G. I. sleeves made of G. I. pipe (class B), each 150mm long welded at one end to 10 mm thick m.s. plates (4 nos per tyre) inside, outside of tyre fender to prevent tear of tyre around the hole to which the M.S. chain link shall pass through the slot made in the plate as directed and this assembly is passed through a 110mm dia approx. circular hole made in the tyre surface and the other end of the m.s. chain is clamped to the eye hook using a bull dog clamp of proper size providing safety equipments, pontoons, scafolding as directed. All tools, plant, labour and material etc complete. Note: Rates shall includes the cost of suppply and fabrication G.I pipes,M.S. plates,bull dog clamps and installing of tyre fenders. |
| 57 | Lifting existing Giant tyre fenders, cutting MS chain, corrodded pipe sleeves with MS plate, removing and re-fixing the Giant tyre fenders from Berth No.8 by changing the 100mm dia sleeves of 100mm dia GI pipe B Class 150mm long, welding 200mm X200mm X10mm Ms plate( 2nos for each sleeve on both side) including removing old damaged/ corroded sleeves, providing and fixing 2 nos GI ‘D’ clamp/ shackle of approved size and quality, including replacing old chain with new chain as and where required, the chain will be supplied free of cost by department if available etc. providing safety equipments, pontoons, scaffolding as directed etc. All tools, plants, labour and materials etc. complete.(rate includes the cost of supply and fabrication, GI pipes, MS plates, bull dog clamps and installing of tyre fenders.) Note: (1) water and electricity will be supplied by the department free of cost, subject to availability at the nearest point. Contractor shall provide on site adequate quantity supply of drinking water for the use of contractor\"s staff, workmen etc. |
| 58 | Providing and fixing 32mm dia eye hook 250mm long, drilling hole/ core cutting in RCC to a depth of 250mm including fixing in Concrete with FOSROC Lock Fix P chemical etc. All tools, plants, labour, materials etc. complete. (Additional hooks as and where required) |
| 59 | Supplying Giant tyre of size 18X25 (untorn) in good condition fenders as and when required, of approved size in good condition (torn and cracked tyres will not be accepted) including cost of transporting the same to the site, loading, unloading etc.All tools, plants, labour, materials . |
| 60 | Fixing of fabricated M.S. ladders supplied by the Dept. including transportating the ladders from the Port Workshop, Baina to the dock/ berth/ jetty /Mooring Dolphin areas in the Port as directed including loading, unloading, lowering, holding in position for fixing the ladder at the berth/ mooring face, cutting, re- fabricating the ladder |
| 61 | Providing and fixing punched tape concertina coil (Zinc coating-275GSM) in position of 610mm diameter, wire of short profile with HTGS spring core wire diameter of 2.5mm pitch between barbed 25mm, having 50 rounds per 6meter length 6meters length with necessary clips, laying concertina on barbed wire etc. All tools, plants, labour and materials etc. complete. |
| 62 | Supplying and fixing woven plain GI wire fencing (chainlink fencing of 75mm (3\") X8 SWG mesh fixed to ISA angles including providing 2nos 16mm dia MS bars at top and bottom of fencing for every 1.2m height of fencing, welding 16mm diameter bars to angles or welding to the angles with small MS fixture for support, tying with binding wire, staples, painting MS bars/ MS fixures with two coats of Synthetic enamel paint over a coat of red oxide Zinc cromite primer rate include remoing old damaged fencing etc. but excluding cost of angles. All tools, plants, labour and materials etc. complete. |
| 63 | Pruning/Trimming of tree branches of any girth prone danger to life, using chain saw machine, manual cutting including hiring of crane for holding lowering and stacking/cutting etc complete. The labourers should provide safety gadget during the work. Work to be done as directed without causing any damage to port or port user property including transporting away the leaves and other unserviceable materials , debris, cleaning the area and stacking of unserviceable material, cut firewood at places pointed out within MPA estate as directed . All tools, plants, labour, materials etc complete. |
| 64 | Providing skirting/dadooing to the required height with best qualityvitrified tiles spartek or equivalent quality set over a base of cement mortar (1:3) 10mm thick including cutting the tiles where required necessary specials, pointing, curing etc. All labour &material complete. |
| 65 | Providing flooring with ceramic tiles laid over 12mm thick C.M. (1:3) including cleaning, curing etc. All labour & material etc. complete. |
| 66 | Providing skirting/dadooing to the required height with best quality ceramic tiles spartek or equivalent quality set over a base of cement mortar (1:3) 10mm thick including cutting the tiles where required necessary specials, pointing, curing etc. All labour & material complete. |
| 67 | Dismantling flooring tiles laid in cement mortar including stacking of serviceable items & disposal of unserviceable materilas within a lead of 100m including all labour & material, tools & plant etc. complete. |
| 68 | Removing old paver block from pavement including stacking of serviceable items & disposal of unserviceable materilas within a lead of 100m including all labour & material, tools & plant etc. complete. |
| 69 | Laying interlocking concrete paving blocks of approved pattern, 100mm thick over a layer of sand cushion including spreading sand, laying the blocks to required slope, levelling, filling the joints with dry sand, cleaning the surface etc. as directed. All labour and material complete.Note: paving blocks supplied by the Department over a layer of sand cushion etc. complete. |
| 70 | Providing & laying interlocking concrete paving blocks of approved pattern, 100mm thick over a layer of sand cushion including spreading sand, laying the blocks to required slope, levelling, filling the joints with dry sand, cleaning the surface etc. as directed. All labour and material complete. |
| 71 | Providing & laying interlocking concrete paving blocks of approved pattern, 60mm thick over a layer of sand cushion including spreading sand, laying the blocks to required slope, levelling, filling the joints with dry sand, cleaning the surface etc. as directed. All labour and material complete. |
| 72 | Fixing 5.5mm thick wired glass of size approx (50x50cm) at LOCO shed baina including bedding in putty and fixed with glazing pins beading including cost of glass panes, providing safety equipments, etc. All tools, plants, labour, material etc, complete. Note: cost to include for all labour, material, scafolding, etc. including removal of broken glass and disposing off the same |
| 73 | Supply of \"Dr Fixit 310 PIDIcrete URP\" compound |
| 74 | Supplying and fixing FRP door shutter 30mm thick including oxidised iron fittings like butt hinges etc. All labour & materials etc. complete. |
| 75 | Providing & fixing FRP door single shutter including frame of standard size incl. Necessary brackets/fasteners etc. |
| 76 | Providing and fixing wood work in frames of doors, windows, ventilators etc. with well seasoned sal wood including m.s. holdfast 40 mmx 25 cm long 6 nos. embedded in c.c. (1:3:6) blocks,16 mm dia m.s. bottom pins including necessary painting 9primer and two coats of synthetic enamel paint). All labour & material etc. complete. (New frames)\" |
| 77 | Supplying and fixing flush doors without ventilator 30mm thick both sides commercial faced using salwood frame including SS hinges 100 x 58 x 1.8mm size 4 nos. for door shutter providing M.S. hold fast 6 nos. embedded in C.C. (1:3:6) block, 16mm dia M.S. bottom pins etc. Including dismantling of old existing door frame and taking away the same etc finishing the damaged surface with CM (1:3), Painting of door and fame with two coats of synthetic enamel paint over one coat of wood primer. All labour & materials etc. complete. |
| 78 | Dismantling doors, windows and ventilators having area not more than 3.0m2 including removal of frames, fastening etc. from masonry and stacking at places pointed out within a lead of 100m including all tools & plant labour & material complete. |
| 79 | Supplying & fixing 19mm dia aluminum curtain rods with powder coating (hollow type)and with necessary aluminum brackets fixed to wooden plugs,2 nos. All tools, plant, labour & material complete |
| 80 | Dismantling of existing Aluminium partitions made of particle boards/aluminium partition fully /partly panneled /partly glazed including removing door shutters, glass, pannels, acessories, etc. and stacking with care as directed. All tools, plants, labour & material etc. complete. |
| 81 | Re-fixing of Aluminium partitions made of particle boards / aluminium partition fully/partly paneled / partly glazed including fixing the door shutters making required modifications, replacing the damaged/worn out beeding for glass, frame with new beeding etc. including fixing all cleats, screws, door closures, door stoppers, cutting glass, fixing glass accessories, loading shifting/ transporting it to new location to be fixed with care, unloading, lifting the materials to upto 5th floor of the building, etc. as directed complete. All tools, plants,labour & material etc. complete. |
| 82 | Providing and fixing aluminium powder coated frames partition with doora) including providing and fixing aluminium powder coated frame partition (shade of powder coating brown) using section for rectangular tube of size 63.5 mm x 38.10mm x 1.2mm thick with intermediate horizontal member at 1.2 m level and vertical member to be equally spaced so as the distance shall not exceed more than 1.15m. Partition shall have both sides prelaminated board off - white. The aluminium section shall have matti wood fixed on inside pheriphery of size 25mm x 25mm fixed to aluminium section using screws of appropriate size, prelaminated board to be fixed to the powder coated aluminium angle size of 20mm x 20mm x 16swg (shade of powder coated off white) using screws of appropriate size. Plain float glass of 5 mm thick to be provided above 1.2m height fixed to the aluminium section using powder coated aluminium angle of size 20mm x 20mm x 16 swg on both faces of glass using screw of appropriate size. Rates shall include powder coating, wastage, cutting, fixing, providing necessary cleats, using self taping screws etc. All tools , plants, labour and materials etc complete |
| 83 | Repairs to the aluminium frame sliding window, aluminium frame door including removing and refixing the shutters, cleaning the grooves, channels, replacing the worn out runners, rubber beeding but excluding the cost of Glass. All tool, plants, labour, material, etc. complete |
| 84 | Providing & fixing in position anodised aluminium sliding windows of approved manufacturer to suit two track sliding, using best quality standard extruded anodised aluminium sections (manufactured to relevant I.S. specification) without horizontal glazing bars, glazed with 5.5.mm thick sheet glass fixing to RCC column/masonry with lugs of 16mm x 3.15mm x 10cm long or any other approved size embedded in C.C. (1:3:6) blocks of appropriate size incl. necessary bolting devices, handles, locking arrangements, fixing clips, metal putty, PVC/Rubber beading etc. |
| 85 | P & F in position anodised aluminium sliding windows of approved manufacturer to suit three track sliding, using best quality standard extruded anodised aluminium sections (manufactured to relevant I.S. specification) without horizontal glazing bars, glazed with 5.5.mm thick sheet glass fixing to RCC column/masonry with lugs of 16mm x 3.15mm x 10cm long or any other approved size embedded in C.C. (1:3:6) blocks of appropriate size incl. necessary bolting devices, handles, locking arrangements, fixing clips, metal putty, PVC/Rubber beading etc. All tools, plants, labour & material etc. complete. |
| 86 | P/F in position aluminium louvered ventilator with Glass Louvers. using best quality standard extruded anodised aluminium sections (manufactured to relevant I.S. specification) All tools, plants, labour & material etc. complete. |
| 87 | Removing the damaged lock of aluminium frame door and fixing of new lock . All tools, plants, material, etc. complete |
| 88 | Providing 5.00 mm thick glass for the aluminium frame window/door, including removing the damaged glass, replacing the damaged beading, sealing the gaps in between wall and window frame using M seal, touch up painting as directed. All labour and material, tools & plant etc. complete. |
| 89 | Providing 4.00 mm thick pin headed/plain glass for louvered ventilators as directed. All labour and material, tools & plant etc. complete. |
| 90 | \"Supplying and fixing false ceiling with gypsum board 12mm thick of size of size 2\"X2\" or more supported on GI grip roof channel 2\"\"X2\"\" for main support, aluminium supporting grid, Including providing new main support to the roof as where required as per department direction . all labour and material etc complete. |
| 91 | Supplying and fixing in position mosquito proof netting to the windows,including fixing Velcro tape fixed to the window frame with required screws, nails etc. and stitching of other part of Velcro to the net etc. All labour and material tools and plant etc. complete. |
| 92 | Providing and fixing teakwood beeding frame of min. size 1.5\"x1/4\" on the wall including providing necessary nails, screws, etc. as directed by the Chief Engineer or his authorised representative. All labour and material tools and plant etc. complete. |
| 93 | Providing and fixing Sal wood frame of required size for fixing on the wall/ ceiling including providing necessary nails, screws, etc. as directed by the Chief Engineer or his authorised representative. All labour and material tools and plant etc. complete. |
| 94 | Supplying & fixing the following fittings/fixtures to doors & windows etc. including necessary screws, washers etc. All labour & materials complete. |
| 95 | Anodised aluminium tower bolt 15 cm long |
| 96 | Anodised aluminium latch 20 cm long |
| 97 | Flush Door Stopper with rubber bush |
| 98 | Anodised aluminium baby latch |
| 99 | Anodised aluminium D-type door handle 10 cm long |
| 100 | Stainless steel butt hinges 100 mmx70mmx40 mm |
| 101 | Stainless steel butt hinges 75mmx40mm x 2.5 mm |
| 102 | Supplying & fixing Automatic/ hydraulic door closer of \"Everite/ Godrej make including necessary screws, washers etc. All labour & materials complete. |
| 103 | Providing roofing compound to the bolt, along the cracks of sheets, joints of asbestos sheet roofing. All tools, plant, labour, materials, etc. complete. |
| 104 | Welding to any type of structural steel works tack welding or stitch welding of 6 mm thick as per IS specification etc. including required welding rods .etc. complete as directed. (Note: Steel sections, angles, plates if necessary will be supplied free of cost by the MPA. Contractor has to procure their welding plants.All labour & materials ,tools &plants etc.complete.The item is in running Meter of weld length). |
| 105 | Cutting any type of structural steel works of any thickness by gas cutting complete as directed. All labour & materials ,tools &plants etc. complete(Note: Gas cutting with cetelene oxygen set will have to be provided by the contractor. The item is in running Meter. of cut length). |
| 106 | Repairs and servicing of Rolling shutters (Approx. minimum size size of shutters 3x2.5 mtrs ) including removal and assembling after repair of i.e. top hood shaft cage, shaft case, shaft brackets, springs, side guides bottom rails, gear units, bearing , thoroughly cleaning all the components, adjusting the tensioning springs, overhauling or repairing shaft and gear units, re-conditioning and clips, realigning curtain ends, reconditioning dents if any, on the surface bottom rail and side guides, repairing the starters, inspecting, taking out and replacing the damaged or defective components, ensuring proper locking arrangements from both side and outside including all welding, drilling , straightening, grinding, erection of scaffolding, ladders, tools, tackles, labour, overhead profit, transportation with all consumables, such as lubricant like gears etc. and all hardware’s such as nuts, bolts, rivets, screws, washers, keys, etc. for effective working of rolling shutter. All labour & materials ,tools &plants etc.complete |
| 107 | Providing new Rolling shutters (approx. minimum size size of shutters 3x2.5 mtrs) including removal of old rolling shutter and taking away and providing a new assemby of top hood shaft cage, shaft case, shaft brackets, springs, side guides bottom rails, gear units, bearing , thoroughly cleaning all the components, providing tensioning springs, and surface bottom rail and side guides, repairing the starters, providing proper locking arrangements from both side and outside including all welding, drilling , straightening, grinding, erection of scaffolding, ladders, tools, tackles, labour, overhead profit, transportation with all consumables, such as lubricant like gears etc. and all hardware’s such as nuts, bolts, rivets, screws, washers, keys, etc. for effective working of rolling shutter. All labour & materials ,tools &plants etc.complete |
| 108 | Providing and erecting cup lock /H frame of steel double scaffolding of required height,width and strength by sides of building at any level from ground to any floor height as directed including working platform etc. and maintaining it in serviceable condition for the required duration as approve and a directed and removing it thereafter, necessary safety features for the workmen etc. complete.as per direction ..etc. . All labour equipment\"s materials etc. complete. |
| 109 | Dismantling & clearing away corrugated/ semi corrugated A.C sheets in roof including ridges, hips, gutters etc. & stacking the serviceable material & disposal of unserviceable material at places pointed out within a lead of 100m including all labour & material, tools & plant etc. complete. |
| 110 | Fixing asbestos cement corrugated sheets in roofing supplied by department including cutting/ mitering, drilling holes, fixing with necessary G.I. bolts, nut G.I. and bitumen washers etc. All labour & material, tools and plant complete.Note:1. A.C. sheets will be issued free of cost by department. However bolts, nuts, hooks, washers etc., are to be provided by the contractor at their own cost.Note:2. Transportation of sheets from MM/AXEN(GCB) store shall be arranged by the contractor at his own cost. |
| 111 | Extra for A.C. corrugated / semi corrugated sheets supplied by the Port in vertical sheeting or to a pitch exceeding 60 degree |
| 112 | Fixing A.C. plain adjustable ridges including drilling holes, necessary G.I. bolts, nuts, G.I. and bitumen washers etc. All labour and material complete. Note:1. A.C. sheets will be issued free of cost by department. However bolts, nuts, hooks, washers etc., are to be provided by the contractor at their own cost.Note:2. Transportation of sheets from MM/AXEN(GCB) store shall be arranged by the contractor at his own cost. |
| 113 | Supplying & fixing galvalume sheets of 0.45mm thick of Tata/Jindal or any other equivalent in roofing including drilling holes necessary self drilling screws G.I and bitumen washer etc. All tools,plants,labour and material etc complete. |
| 114 | Supplying & fixing galvalume ridges of 0.45mm thick of Tata/Jindal or any other equivalent in roofing including drilling holes necessary self drilling screws G.I and bitumen washer etc. All tools,plants,labour and material etc complete. |
| 115 | Roofing with (corrugated) Everlast/ Jindal aluminium sheets 0.55mm thick with aluminium \"J\" Bolts set including Bolt Nut, Neoprene and Bitumen washer etc. |
| 116 | Supply of rain protection plastic sheet of 8 ft wide for covering /protection |
| 117 | Supply of M.S. bars of 8mm,10mm,12mm,16mm, 20mm,25mm |
| 118 | Supply of M.S. Angles 50x50x6mm, 65x65x6mmx 75x75x6mm |
| 119 | Supply of Cement in bags |
| 120 | Supply of River Sand |
| 121 | Supply of 10/20mm metal stone |
| 122 | Supply of CC block of size 30*20*15cm of 35 kg /cm2 compressive strength |
| 123 | Supply of Bricks |
| 124 | Supply of PVC fibre corrugagated transparent sheet |
| 125 | Supply of M25 gr RMC Concrete |
| 126 | Supply of 1/2 round 300 mm dia hume pipe |
| 127 | Supply of 350 mm dia NP3 hume pipe |
| 128 | Providing and fixing false ceiling with plain WPVC sheets 8mm thick including fixing to aluminium bracings, providing taping,etc. |
| 129 | Execution of day to day works by supply of high skilled artisans like Carpenters, masons for works of restorative repairs, aluminium doors and window repairs, shutters and gate repairs etc as directed, with tools for a period of 8 hours per day as and when required etc complete |
| 130 | Execution of day to day works by supply of mazdoor with tools for a period of 8 hours per day as and when required etc complete |
| 131 | Hire Charges of Mini-pickup/ small commercial vehicle of Ashokleyland Dost or equivalent for 8.00 hrs. per day including cost of fuel, consumables, lubricants, driver. (as and when required) |
| 132 | Hiring Charges of Back hoe Excavator Machine with breaker attachment (JCB or equivalent) for 8.00 hrs. per day for carrying out excavation in dense hard soil /murrum/ cargo dumps, boulders, concrete etc. at places directed in Dock area and Headland Sada area, including excavating, loading, levelling, grading etc complete. The charges to include cost of fuel, consumables, lubricants, operator & cleaner charges. All tools, plant , labour and materials etc complete. |
| 133 | Hiring Charges of Tipper Truck of minimum 6 M3 capacity, for transporting of available excavated earth/ cargo dumps , inside Dock area and from Headland Sada area, as directed by Chief Engineer or representative. The charges to include cost of fuel, consumables, lubricants, driver & cleaner charges. All tools, plant , labour and materials etc complete. |
| 134 | Hire charges of Crane of 11 T approx. capacity including cost of fuel, consumables, lubricants, driver, slings for lifting/holding/lowering.etc.. All tools, plant , labour and materials etc complete. |
| 135 | Hire charges of Tree prunning / chain saw machine- 22 inch petrol operated excluding fuel and oil..etc. All tools, plant , labour and materials etc complete. |
| 136 | Cutting of stem/ branches of uproooted/fallen trees by using Chain Saw and manual means into managable log size as directed |
| 137 | Hire charges of portable concrete breaker with cable (excluding power supply) |
| 138 | Hire charges of Single phase welding set with cable (excluding welding rods and power supply) |
| 139 | Hire charges of gas cutting set ( excluding gas cylinders) |
| 140 | Hire charges of 5KVA generator for welding excluding cost of fuel |
| 141 | Supply of Oxygen gas for cutting/dismantling M.S. structures |
| 142 | Supply of Acetylene gas for cutting/dismantling |
| 143 | Supplying and fixing Pre-cast cement concrete kerb stones M20 grade made as per standards |
| 144 | Providing and fixing half round PVC pipes 300 mm dia, for rain water drainage including providing m.s clamps, removing the old damaged pvc pipe and stacking within a lead of 100 mtr. All tools, plants, labour and materials etc complete. |
| 145 | Desludging of septic tank including lifting of cover slab, transporting the sludge & other waste materials in sewage tanker, disposing the same, cleaning the tank and placing back the cover slab, sealing the joints etc. All tools, plants, labour and materials etc. complete. (Each trip to be considered as No) |
| 146 | Cleaning of Soak pit by replacing boulders of existing soak pit with new boulders of size 15 to 25 cm including dismantling existing PCC, removing existing boulders disposing the same including providing PCC (1:3:6) 8cm thick on top of soak pit etc. and realigning the rainwater flows. All tools, plants, labour and materials etc. complete. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail