| 1 | 1).Upgradation of the Road @ Annai Indira Nagar Perambalur Car Carrage to Annifa Bhai House H/o Elambalur Pt. Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 |
| 3 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction |
| 4 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 5 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 6 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,Complete. |
| 7 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 8 | Provision for Name Board Charges |
| 9 | 2).Construction of New Open Well @ Indira Nagar H/o Elambalur Pt. Geophysical survey charges including conveyance charges for the Geo-physical instruments and other accessories. |
| 10 | Drilling of trial Bore well at the center of the Open well |
| 11 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Hard stiff clay Hard stiff clay, stiff black cotton soil, hard red earth, shales,murrams gravel,stoney earth and earth mixed with small size boulders and hard gravelly soil Ist depth from 0.00m to 1.00 m |
| 12 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Soft disintegrated rock, laterite, soft rock or kanakar not requring blasting etc complte Ist depth from 1.00m to 2.00 m |
| 13 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock not requring blasting etc complte IInd depth from 2.00m to 4.00 m |
| 14 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock not requring blasting etc complte IIIrd depth from 4.00m to 6.00 m |
| 15 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock not requring blasting etc complte IVth depth from 6.00m to 8.00 m |
| 16 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock not requring blasting etc complte Vth depth from 8.00m to 10.00 m |
| 17 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Hard granite measured in solid including blasting and stacking etc complte VIth depth from 10.00m to 12.00 m |
| 18 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Hard granite measured in solid including blasting and stacking etc complte VIIth depth from 12.00m to 14.00 m |
| 19 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Hard granite measured in solid including blasting and stacking etc complte VIIIth depth from 14.00m to 14.45 m |
| 20 | P.C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc complete |
| 21 | Centring charges for lintel and roof slab including strutting charges etc., complete.and conveyance of all materials to site and all labour charges etc., complete. |
| 22 | Supply and fabrication of RTS rods including all charges etc., complete. |
| 23 | R.C.C 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc.,complete. |
| 24 | Provision for Name Board Charges |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |